Similar Projects
Attoyac Bayou Site 21 Remedial Repairs In Nacogdoches County, Texas
Term Contract
Design
$100,000 to $250,000 est. value

Construction of Water, Sanitary, and Drainage Facilities in Lago Mar Pod 2 Section 1
Infrastructure
Bidding
$200,000 est. value
Galveston, TX

Dove Meadows and Bordens Gully Detention Pond
Infrastructure
Bidding
League City, TX

Galveston Seawall Rip Rap Deficiencies West of 61st Street
Post-Bid
$2,200,000 est. value
Galveston, TX

Construction of Water, Sanitary Sewer, Drainage and Paving to Serve Westwood Section 9
Post-Bid
League City, TX

Streets and Drainage
Results
Less than $1,200,000 est. value
Santa Fe, TX

Corrugated Polyethylene Pipe for Culverts
Results
Galveston, TX 77550

Dellanera Park Beach Harvey Repair CEPRA
Infrastructure
Bidding
$5,000,000 to $8,000,000 est. value
Galveston, TX 77554

Centennial Park and Lakes of Falcon Ridge Wall Project
Post-Bid
Friendswood, TX

Highland Bayou Jay Road Ditch Improvements
Results
$680,000 est. value
Galveston, TX

Jackson Avenue Drainage Improvements
Infrastructure
Post-Bid
$2,700,000 est. value
Galveston, TX

Highland Bayou Slope Stability Project
Results
$800,000 est. value
Galveston, TX

Bay Colony Area Detention Modification
Infrastructure
Post-Bid
League City, TX 77539

Water Sanitary Sewer Storm Sewer and Paving to Serve Cobblestone Section 2
Results
Texas City, TX

Humble Camp Road Drainage Project
Infrastructure
Post-Bid
$150,000 est. value
Texas City, TX

Last Updated 06/29/2022 11:34 AM
Project Title

23rd Street Paving, Drainage and Utility Rehabilitation

Physical Address View project details and contacts
City, State (County) Galveston, TX 77550   (Galveston County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $9,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

contractor for the reconsruction of 23rd Street in Galveston, Texas from Broadway to Seawall Blvd. This will entail the removal of the existing road and replacing it with concrete along with the construction of ADA ramps and sidealk upgrades. The project includes water, sanitary sewer system and storm sewer system upgrades on 23rd Street as well as on Avenue K from 23rd to 21st Street.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents