Similar Projects
Re-Bid Insulation Repair Services For Plumbing And Heating, Cooling, Ventilation Systems
Term Contract
Post-Bid
Springfield, IL 62701

HVAC Preventive Maintenance and Repair Services
Term Contract
Post-Bid
East Saint Louis, IL

HVAC Chiller Maintenance
Results
Belleville, IL 62225

FY21 HVAC Cooling Tower Treatment
Results
Belleville, IL 62225

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC Renovation and New Gym Addition Pathways at Elementary School
Alteration
Results
Belleville, IL 62221

Exhaust/Make-Up Air System
Post-Bid
Sauget, IL 62201

PAV HA 6th Floor Lab - RO System Upgrade BP-02 (GC)
Alteration
Results
Lexington, KY 40506

HVAC Roof Top Units
Alteration
Post-Bid
Dupo, IL

Replace Mechanical and Electrical Systems, Improve Fire Safety and Security - Ventilation
Alteration
Results
Less than $900,000 est. value
Collinsville, IL 62234

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Replace Mechanical and Electrical Systems, Improve Fire Safety and Security - Heating & Air Conditioning
Alteration
Results
Less than $600,000 est. value
Collinsville, IL 62234

FY22 HVAC Cooling Tower
Term Contract
Post-Bid
Scott Air Force Base, IL 62225

Boiler & Chiller Replacement
Alteration
Results
Belleville, Granite City, IL 62220

HVAC and Electrical Upgrades
Alteration
Post-Bid
Centreville, IL

Last Updated 03/02/2022 02:20 PM
Project Title

HVAC Chiller Maintenance

Physical Address View project details and contacts
City, State (County) Scott Air Force Base, IL 62225   (Saint Clair County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor is required to provide the necessary labor, materials and equipment to perform chiller and Variable Frequency Drive (VFD) maintenance at B/1900 on Scott AFB, IL. Without limiting the generality of the foregoing, the Contractor shall be required to perform the required work on a quarterly, semi-annual and annual basis. The Contractor is required to abide by Scott AFB, local, county, state and federal laws under this contract. The Contractor shall provide authorized technicians, with appropriate documentation, with the ability to perform maintenance/repair on Carrier Chillers. The Contractor is required to follow Carrier manufacturers recommended methods/procedures to maintain/repair Carrier chillers. The Contractor shall provide personnel, tools, supplies, transportation and equipment necessary to accomplish requirements under this contract.

Details

Division 01 - General Requirements, Quality Control, Testing and Inspecting Services.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents