Similar Projects
Infrastructure Improvements Projects-Construction Qualifications
Term Contract
Bidding
Southfield, MI

Catch Basin Cleanout
Post-Bid
Reed City, MI 49677

Drop Shaft and Connecting Sewer Rehab-ST-S-4, ST-S-5 and UT-S-1
Post-Bid
Clinton Township, MI

Bedford SRF Manholes and Sewer Improvements
Results
Less than $1,750,000 est. value
Monroe, MI

Street and Utility Improvements - Washington Street and Dye Street
Results
Less than $1,362,523 est. value
Ionia, MI

Sanitary Sewer Rehabilitation Project
Construction
Less than $200,000 est. value
South Rockwood, MI

Grinder Pump Installs and Sanitary Sewer Repairs
Term Contract
Post-Bid
Brighton, MI 48114

Sanitary Sewer Repairs
Results
Less than $60,000 est. value
Wyandotte, MI

Two (2) Years – Hydrant, Grate and Manhole Cover Parts
Term Contract
Post-Bid
Flint, MI

Catch Basin Clean Out
Results
Hillsdale, MI

Trough Drain Maintenance
Post-Bid
Sandusky, MI

Royal Oak Township Sanitary Sewer Rehabilitation
Results
Less than $378,574 est. value
Royal Oak, MI

Big Creek Drain Maintenance
Post-Bid
Sandusky, MI

Maple Grove Avenue Reconstruction, Phase 1
Results
Less than $873,100 est. value
Hudson, MI

Cargill and BRS Drain Maintenance
Post-Bid
Sandusky, MI

Last Updated 05/20/2020 04:04 PM
Project Title

2019-2022 Sewer Cleaning and Video Inspection Service

Physical Address View project details and contacts
City, State (County) Port Huron, MI   (Saint Clair County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work consists of furnishing all labor, material and equipment required for video inspection and/or cleaning of sanitary, storm and combined sewers as per the project specifications. The project is divided into two (2) parts. Part I is for work related to inspection for the design of future road and utility construction projects. Television inspection operations for Part I are estimated to include approximately 30,000 feet of 8-inch through 54-inch diameter sewer lines. Part II is for emergency services and is estimated to include approximately 500 hours total for cleaning and television inspection.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents