Similar Projects
Entergy Beaumont Service Center Phase I
New Construction - 70,773 SF
Design
$20,000,000 est. value
Beaumont, TX 77708

Install Traffic Signal at Bluebonnett and Gulfway
Infrastructure
Design
$300,000 CJ est. value
Port Arthur, TX 77640

RFQ Construction Manager at Risk - Construction Manager-at-Risk services for Workforce and Allied Health Training Center for Lamar Institute of Technology
New Construction, Infrastructure
Bidding
$27,813,000 CJ est. value
Beaumont, TX 77705

Grain Dock Replacement Project
Infrastructure
Bidding
$700,000 CJ est. value
Beaumont, TX 77702

Hamshire-Fannett High School Additions and Renovations Project
Addition, Demolition, Renovation, Infrastructure
Sub-Bidding
$300,000 CJ est. value
Hamshire, TX 77622

Hamshire-Fannett High School Additions and Renovations Project
Addition, Demolition, Renovation, Infrastructure
Sub-Bidding
$300,000 CJ est. value
Hamshire, TX 77622

Contract to Construct an Equipment Storage Cover Addition at the City Water Reclamation Facility
New Construction
Post-Bid
Beaumont, TX 77705

Construction of the Exxon Mobile Intake Structure
Infrastructure
Post-Bid
Beaumont, TX

Site Preparation - Nederland, Texas
Alteration
Results
$24,046 est. value
Nederland, TX 77627

SH 73 - Metal Beam Guard Fence Repair
Infrastructure
Results
$789,724 CJ est. value
Port Arthur, TX 77640

Williams Reserve East: Paving, Drainage, and Utilities
Infrastructure
Bidding
$153,000 CJ est. value
Beaumont, TX 77702

Construction of Storage Building at Transit Fueling Station
New Construction
Post-Bid
Port Arthur, TX 77640

Hazard Elimination and Safety
Infrastructure
Results
$850,170 CJ est. value
Beaumont, TX 77705

RFP Construction Manager at Risk - Support Service Center Renovations Project
Demolition, Renovation, Infrastructure
Bidding
$12,500,000 CJ est. value
Port Arthur, TX 77640

Directional Boring at Green Acres North Detention Project
Infrastructure
Post-Bid
$150,000 est. value
Beaumont, TX

Last Updated 08/08/2022 03:32 PM
Project Title

Howard Energy Services DGD Unit Warehouse

Physical Address View project details and contacts
City, State (County) Port Arthur, TX 77640   (Jefferson County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Site Development, Warehouse/Storage
Contracting Method Bids by Invitation
Project Status Obtained from a credible source, Awaiting verification, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $2,700,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 8, 2022, no building permits have been submitted into the City of Port Arthur. Information regarding the architect and general contractor has not been disclosed. A firm construction timeline has not been established. * *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

10,000 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents