Similar Projects
Uninterruptible Power Supply (UPS)
Bidding
Dallas, TX 75214

Radio Tower Lighting Maintenance and Repair
Term Contract
Post-Bid
McKinney, TX 75071

NTMWD Wylie WTP High Service Pump Station 2-1 2016 Electrical Improvements Phase II B
Post-Bid
$3,200,000 to $3,600,000 est. value
Wylie, TX 75098

PISD Marquee Replacement
Results
$207,876 est. value
Prosper, TX 75078

Flow Meter Replacement Stacy #1 & 2 and Custer #1
Results
Allen, TX 75002

Uninterruptible Power Supply Replacement
Post-Bid
TX 75071

Medical Examiner Office Exterior Lighting
Results
$7,474 est. value
McKinney, TX 75069

Courtyard Theatre Performance Lighting Upgrade
Post-Bid
$440,000 est. value
Plano, TX 75074

Athletic Light Bulb Replacement and Repair Services
Term Contract
Results
$15,740 est. value
Allen, TX 75002

5D4m-Replace Hospital Power Lines
Post-Bid
$25,000 to $100,000 est. value

Installation of Illumination and DMS Rehabilitation
Results
Less than $1,660,079 est. value
TX

Uninterruptible Power Supply Replacement
Post-Bid
Less than $165,000 est. value
McKinney, TX

Parking Lot LED Lighting Upgrades Multiple Sites
Results
$500,000 est. value
Plano, TX 75023

Stage Lighting Fixtures and Equipment for the Fine Arts Center
Post-Bid
Plano, TX

Electrical Maintenance
Results
Plano, TX 75023

Reported 04/25/2020 12:00 AM
Project Title

Wylie Water Treatment Plant High Service Pump Station 2-1 2016 Electrical Improvements Phase II

Physical Address View project details and contacts
City, State (County) Wylie, TX 75098   (Collin County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Project will include improvements to the electrical equipment at Rockwall/Farmersville Pump Station, adding adjustable frequency drives to two pumps at the High Service Pump Station 2-1, and add a second feeder to the Blower Building. The following is a brief summary of work: 1. Demolish existing RF-MVMCC 2. Refeed existing pumps from new starters installed inside existing spaces at new HSPS 2-1 MVMCC 3. Demolish PLC inside RF-HSPS 4. Demolish 480V MCC and refeed existing loads from MCC-8112-1 inside 2-1 Electrical Building. 4. Install two 4160V, 1500HP AFDs 5. Replace two 4160V motors at HSPS 2-1

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents