Similar Projects
Equipment Operation and Maintenance for The Central Energy Building, Naval Health Clinic, MCAS Cherry Point Nc
Design
Cherry Point, NC

3145 South Tryon Street Chiller Replacement Project
Alteration
Bidding
$450,000 to $500,000 est. value
Charlotte, NC 28217

Construction of NCA and T Fort IRC 25-Ton Chiller Replacement
New Construction, Alteration
Bidding
Greensboro, NC

PC Air Units
Post-Bid
Charlotte, NC 28208

Removal and Replacement of HVAC Systems-Multiple Locations
Post-Bid
Wilmington, NC 28402

Install 20 HVAC Systems in RHA Occupied Public Housing Community
Results
Rockingham, NC 28379

HVAC Repairs Rachel Freeman School of Engineering
Results
Less than $93,657 est. value
Wilmington, NC 28405

HVAC Air Filter Preventative Maintenance Service
Alteration
Bidding
Charlotte, NC

Remove and Replace (2) HVAC Systems
Post-Bid
Elizabeth City, NC 27909

Legacy and Jones Residence Halls Make-up Air
Results
Less than $1,655,170 est. value
Greenville, NC

Replace Chiller at Pisgah Elementary School
Alteration
Bidding
Candler, NC 28715

HVAC, Electrical and Plumber Contractors for Home Energy Improvement Project - NC Weatherization Assistance Program
Renovation
Post-Bid

Cooling Tower Replacement Smith High School Project
Results
Greensboro, NC 27406

HVAC Upgrades - Riverside Campus
Post-Bid
Louisburg, NC 27549

EMD Facility HVAC Upgrades
Results
Wilmington, NC

Last Updated 09/21/2021 01:39 PM
Project Title

Eastern Wayne High Chiller

Physical Address View project details and contacts
City, State (County) Goldsboro, NC 27534   (Wayne County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work is as follows: Provide and install the following Equipment: (1) Trane CGAM 40Ton Chiller (see separately attached chiller specs for all performance requirements) Demo and remove existing equipment, piping controls and electrical as required. Disposal of the existing equipment as required to meet the EPA guidelines. Provide and install new hydronic piping to connect the existing piping to the new chiller equipment as required. Provide and install the appropriate chill water piping accessories such as strainers, flex connectors, butterfly valves thermometers and psi gauges as required. Provide and install new heat tracing on all exterior piping as required. Insulate all exterior chilled water piping with 2” fiberglass with aluminum jacket as required. Provide and install electrical materials needed to connect to new chiller as required. Ensure the chiller listed above includes a BACnet card for connecting to the building automation controls. Connect the equipment listed above to existing Envirocon HVAC controls located in mechanical room of the building the new equipment will serve.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents