Similar Projects
Hodgdon Boiler Replacement at Border Patrol Sector Headquarters In Hodgdon, ME
Term Contract
Design
$250,000 to $500,000 est. value
Hodgden, ME

York Middle School and York High School Mechanical Upgrades
Alteration
Bidding
$330,000 est. value
York, ME

Cooler/Freezer Replacement Project
Alteration
Bidding
York, ME 03909

Energy Conservation Project
Post-Bid
Lubec, ME

EMCC Boiler Room Piping Project
Post-Bid
Bangor, ME 04401

Replace DHS Section SD18-SD19
Results
Orono, ME 04401

Building 518 Boiler Renovations at Air National Guard Base
Results
$135,000 est. value
Bangor, ME 04401

Boiler Service 2021
Term Contract
Post-Bid
Limestone, ME

Mechanical and Plumbing Improvements
Results
Cape Elizabeth, ME 04107

Hodgdon Boiler Replacement
Term Contract
Post-Bid
$250,000 to $500,000 est. value
Hodgden, Houlton, ME 04730

Secondary Clarifier Upgrades
Results
Less than $1,270,000 est. value
Kennebunkport, ME

On-Call Services for General Facilities and Mechanical Maintenance
Term Contract, Alteration
Post-Bid
Less than $50,000 est. value
Orono, ME

South Portland High School Boiler Stack Replacement Project for School Department
Alteration
Results
South Portland, ME

Vine Street School - Heating System Project
Alteration
Post-Bid
Bangor, ME 04401

Hope Elementary School - Boiler Replacement
Alteration
Results
Hope, ME 04847

Last Updated 05/25/2022 11:12 PM
Project Title

Fleet - Boiler Replacement and Installation of Radiant Tubing

Physical Address View project details and contacts
City, State (County) Bangor, ME 04401   (Penobscot County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Boiler replacement and installation of radiant tubing in a new concrete floor of the Fleet Maintenance Facility, 481 Maine Avenue, Bangor, Maine. 1. Work will include installation of radiant tubing in the new concrete shop floor. 2. Work will include replacing the existing boiler with a larger more efficient boiler suitable for the addition of radiant floor heating. 3. The radiant floor tubing will be installed in two phases separated by the masonry wall in the middle of the shop. A. Phase 1 would be the Left Bay (closer to the main office) which is approximately 6,500 sq./ft. B. Phase 2 would be the Right Bay (closer to the parts room) which is approximately 5,700 sq./ft. 4. The boiler will be a 450,000 BTU Boiler at minimum and operate on Propane. 5. The boiler should have a minimum of a 6 zone manifold to handle the existing zones and additional zones for the radiant floor heat. 6. Successful Bidder will need to coordinate and work with the concrete contractor to map out and install the radiant floor tubing. 7. The Successful Bidder will need to remove and dispose of the existing boiler in accordance with all applicable Federal, State, and local laws and regulations.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents