Similar Projects
Z1DA--528A7-17-732 Renovate 5A for Rehabilitation Unit
Renovation
Design
$1,000,000 to $5,000,000 est. value
Syracuse, NY 13210

Valley View Center for Nursing Care Addition
Addition
Design
Greenvale, NY 11548

Addiction Care Center
Renovation - 6,870 SF
Bidding
$1,250,000 est. value
Queensbury, NY 12804

Amethyst House
New Construction - 17,500 SF
Bidding
$1,000,000 to $5,000,000 CJ est. value
Staten Island, NY 10301

Cayuga Addiction Recovery Services Expansion
New Construction - 15,670 SF
Post-Bid
Trumansburg, NY 14886

Renovation for Alcohol and Drug Council of Tompkins County Project
Renovation - 18,808 SF
Post-Bid
Ithaca, NY 14850

Rehabilitate North Side Elevators, 1st Floor at Central NY Psychiatric Center
Results
$50,000 to $2,000,000 est. value
Marcy, NY

McPike Addiction Treatment Center, Phase VI Renovations
Renovation
Results
$530,000 to $560,000 est. value
Utica, NY 13502

Hannick Hall
Renovation, Addition - 26,000 SF
Construction
$4,000,000 est. value
Newark, NY 14513

Robert R Reiss Community Services Center
Renovation, Demolition - 8,000 SF
Construction
$3,000,000 est. value
Saranac Lake, NY 12983

Camelot of Staten Island Treatment Facility
New Construction
Pending Verification
Staten Island, NY 10303

Women's Outreach Residence Hall at Richmond Hill
New Construction - 15,000 SF
Bidding
$3,996,630 est. value
Queens, NY 11418

UHB - Showers for Nurses Station 32
New Construction
Post-Bid
Brooklyn, NY

New York State Office of Mental Health, St. Lawrence Psychiatric Center, Building 203 Boiler Decentralization and Hazardous Materials Removals
Results
$1,100,000 to $1,400,000 est. value
Ogdensburg, NY 13669

2nd Floor Conversion
Renovation - 10,000 SF
Construction
$900,000 est. value
Buffalo, NY 14214

Last Updated 12/29/2021 08:13 AM
Project Title

Jamie Avenue Med Room Build

Physical Address View project details and contacts
City, State (County) Apalachin, NY 13732   (Tioga County)
Category(s) Medical
Sub-Category(s) Nursing/Rehabilitation Center
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $50,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Create Med Room. To create a med room at 3 Jamie Ave in Apalachin. The vendor shall provide all labor and materials necessary to complete the work in a professional manner according to the drawings and below scope of work. 1.Build new partition walls using 2x4 studs, cover with sheetrock and paint to match existing. 2.Install new hardwood Dutch door with integrated shelf and new door trims. 3.Remove existing flooring from entryway through the living room and prepare existing subfloor to install new LVT flooring as shown in the attached drawing. 4.Install cabinets, countertops, and hardware in new med room space as shown in the attached drawing. Cabinet and countertop specs are detailed in the attached drawing. 5.Install base trim on both sides of the new partition walls to match existing. 6.Run a Cat 6 Data line from the server in the office and install a computer jack on the countertop. 7.Install two switches by the door of the med room to control an overhead light and three under cabinet lights. 8.Install six 120v receptacles, three on the countertop, one on the new partition wall, and two on the new living room wall. There are two existing receptacles that are located on the wall where the cabinets will be installed that will need to be raised to above the countertop. 9.A smoke detector will need to be installed in the med room. Contractor will use ADT for the installation and will coordinate with them for the install. 10.Existing overhead lights in the living room will need to be removed, electrical box is to be relocated and one Led light shall be installed. 11.Job shall not be considered complete until all functions have been tested and confirm work in the presence of Plant Superintendent or designee. 12.Contractor is responsible for removal and disposal of debris created during project and for cleaning or repairing any part of the facility damaged during work. 13.Contractor shall warrantee work for a period of one year from date of payment for job. Warrantee shall be for parts and labor. 14.Work shall conform to all applicable codes, be done according to manufacturer’s instructions, and follow industry best practices.

Details

Nursing/Rehabilitation Center, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Wall Coverings, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Wardrobe and Closet Specialties, Closet and Utility Shelving.
Division 11 - Equipment, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Collection and Disposal Equipment.
Division 12 - Furnishings, Art, Window Treatments, Casework, Furnishings and Accessories, Seating.
Division 13 - Special Construction, Radiation Protection.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 25 - Integrated Automation, Integrated Automation Network Equipment.
Division 26 - Electrical, Power Distribution Units, Battery Equipment, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Healthcare Communications and Monitoring Systems.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents