Similar Projects
Last Updated | 07/21/2023 08:12 AM |
Project Title | Fire Station Headquarters Roof Replacement |
Physical Address | View project details and contacts |
City, State (County) | Santa Fe Springs, CA 90670 (Los Angeles County) |
Category(s) | Single Trades |
Sub-Category(s) | Roofing |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected August 2023 |
Bids Due | View project details and contacts |
Estimated Value | $608,392 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Reference Number :0000322745 Prebid Conference :06/28/2023 04:00 PM EDT Contact Information Robert Garcia 562-868-0511 ext. 7545 robertgarcia@santafesprings.org The Agency reserves the right to reject any or all bids. Copies of the Specifications, Plans, and Contract Documents are available during regular business hours at the Office of the City Engineer of the City of Santa Fe Springs, 11710 Telegraph Road, Santa Fe Springs, California 90670. The regular business hours are from 7:30 a.m. to 5:30 p.m. (Closed on alternating Fridays). The Bid must Include a certified or cashier's check, or bidder's bond, made payable to the City of Santa Fe Springs as Agency, for an amount no less than 10 percent of the amount bid. A labor and materials bond and performance bond are prerequisites before contract execution, in the form and amount outlined in the contract documents. The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans and Specifications. The general items of work include complete removal of existing (approximately 11,080 square feet) roofing system and the furnishing/installing of TREMCO (or approved equal) roofing system with appurtenances, completely remove existing acrylic coating on concrete roof expose concrete roofslab and apply TREMCO (or equal). Include for remove existing flashing and replace with new flashing. Apply joint mastic on coping cap and fasteners (Bldg # 5), remove and replace with new roof hatch and safety post (bldg. #2). Remove/replace pitched roof tiles, clean/clear all debris from gutters and construct L-shaped enclosure for the building. - Bid Bond 10 % - Maintenance Bond 100 % - Labor and Materials Bond 100 % - Certified Payroll - Contractors License Required - Insurance Required - License Required - Prevailing Wage Required - Warranty Information Required The successful bidder shall be licensed under provisions of the Business and Professions Code and shall possess a valid California State Contractor's License "C39" and/or "B" at the time the contract is awarded. The successful Contractor and all subcontractors will also be required to possess business licenses from the City of Santa Fe Springs before the commencement of work. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |