Similar Projects
St. Michael Place Extension Phase 3
Bidding
Melbourne, FL 32901

Pre-Event Emergency Roadside Assistance Services
Bidding

Pineapple Complete Streets Project
Post-Bid
$1,119,730 est. value
Melbourne, FL 32935

Front Street Complete Streets Project
Post-Bid
Melbourne, FL 32901

Traffic OPS Improvement
Results
Less than $1,000,000 est. value

Paving Lakeside Lane
Results
Grant, FL 32950

Road Bond Paving - Units 26, 38, 39 and 40
Bidding
Less than $1,421,614 est. value
Palm Bay, FL

Paving IDIQ, CCSFS
Post-Bid
Cape Canaveral, FL 32925

Construction of the Babcock and Valkaria/Wyoming Intersection Improvements
Results
$2,001,643 to $2,280,531 est. value
Valkaria, FL

Asphalt Construction, Sealing & Striping
Post-Bid
$300,000 est. value
FL

Milling / Resurfacing / Widening
Results
Less than $838,432 est. value
FL

Road Bond Paving - Unit 42 and Garvey
Results
Less than $10,234,181 est. value
Palm Bay, FL 32907

Road Bond Paving Units 11, 15, 18, 23 and 56
Results
$10,010,151 est. value
Palm Bay, FL 32907

Cocoa Village Crosswalk Replacement Project
Results
Cocoa, FL 32922

Annual Road Resurfacing - Public Works
Results
Less than $816,000 est. value
Titusville, FL 32781

Last Updated 06/19/2020 08:41 AM
Project Title

St Johns Heritage Parkway (SJHP) Phase 1 and 2 Babcock Connection and Left Turn Lane

Physical Address View project details and contacts
City, State (County) Palm Bay, FL 32907   (Brevard County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $272,436
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of constructing a Southbound left turn lane on Babcock Street located in Brevard County. The lead agency for the construction will be the City. The construction will include grading, fill for subbase and base material, require milling existing pavement and then paving and striping. The project will also complete tie-in connection of 96 linear feet of the St. Johns Heritage Parkway which will also include fill and subbase, base and asphalt pavement to tie the existing pavement on Babcock Street. Construction shall include all incidentals items for work to be performed as per the construction plans for Phase 2 Babcock Left Turn Lane and pay quantities provided in each of the bid documents. The selected contractor shall furnish and install all construction work identified on the plans per the specifications identified herein.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents