Similar Projects
I-70 EB Auxiliary Lane East of Exit 203 in Frisco Through Exit 205 in Silverthorne
New Construction, Infrastructure
Bidding
$20,000,000 est. value
CO

High Country Training Center Improvements
Post-Bid
Frisco, CO 80443

Hamilton Creek Road Resurfacing Project
Post-Bid
Dillon, CO 80435

2020 Access Improvements
Results
Frisco, CO 80443

Roadway Crack Sealing Project
Results
Frisco, CO 80443

High Country Training Center Improvements
Post-Bid
Frisco, CO 80443

Construction Will Consist of Geotechnical Improvements at MM 177.5 A 2" Full Width Mill and HMA Overlay, Striping, Guardrail Improvements
Results
$5,000,000 to $20,000,000 est. value

Civil Site Work IDIQ for Interior Region 8
Post-Bid
$25,000 to $500,000 est. value
Glendale, Yuma, AZ

Mill and Fill, Full Roadway and Shoulder Width in Sections
Results
$5,000,000 to $20,000,000 est. value
CO

Centerra Parcel 301 Public Infrastructure
Results
$1,000,000 to $1,500,000 est. value

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Kinston Residential Phase 1B Public Infrastructure
Results
$1,500,000 to $2,000,000 est. value

Asphalt Mill and Overlay
Results
Frisco, CO

JC-Dap Slurry Seal
Results
Breckenridge, CO 80424

Grinding Existing Pavement Markings and Refreshing
Results
$1,000,000 to $5,000,000 est. value

Last Updated 01/07/2022 09:57 AM
Project Title

Watson Avenue Roundabout

Physical Address View project details and contacts
City, State (County) Breckenridge, CO   (Summit County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,068,831
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The construction of a new, two-lane roundabout at the intersection of SH 9 (Park Ave) and Watson Avenue in Breckenridge, CO and the widening of SH 9 (Park Ave) from two lanes to four lanes for approximately 1200 linear feet. The construction is being funded, managed and contracted through the Town of Breckenridge (no federal funding) and is being permitted through a CDOT access permit. Salient features of the project include demolition, excavation, storm sewer installation, grading, concrete curb & gutter, concrete sidewalks, asphalt pavement, signing & striping, street lighting, landscaping, and construction traffic control.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Demolition, Selective Demolition.
Division 03 - Concrete, Concrete Accessories.
Division 26 - Electrical, Exterior Lighting.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents