Similar Projects
Route 1 Elementary School - Fairfax County Public Schools
New Construction, Infrastructure
Conception
$21,169,000 CJ est. value
Mount Vernon, VA 22309

Silver Line Elementary School - Fairfax County
New Construction, Infrastructure
Conception
$39,574,000 CJ est. value
Fairfax, VA 22030

Dunn Loring Elementary School - Fairfax County
New Construction, Infrastructure - 118,000 SF
Design
$35,332,424 CJ est. value
Vienna, VA 22182

Crossfield Elementary School - Fairfax County
Addition, Renovation, Infrastructure
Design
$32,586,040 CJ est. value
Herndon, VA 20171

RFQ D/B - Defense Logistics Agency Overwatch Booths and Dining Patio Pavers
New Construction, Infrastructure
Post-Bid
$1,942,623 CJ est. value
Fort Belvoir, VA 22060

RFQ D/B - Defense Logistics Agency Overwatch Booths and Dining Patio Pavers
New Construction, Infrastructure
Post-Bid
$1,942,623 CJ est. value
Fort Belvoir, VA 22060

Frontier Drive Extension and Braided Ramps
Results
Less than $89,500,000 est. value
VA

Indefinite Delivery Indefinite Quantity (IDIQ) Paving at Various Locations, Washington DC, MD, & VA
Results
Less than $75,000,000 est. value
Washington, DC

FDLLC Fairfax VA WAWA
Renovation, Demolition
Construction
Fairfax, VA 22031

Brown's Fairfax Mazda
New Construction, Demolition - 103,064 SF
Construction
Fairfax, VA 22030

Sheehy Automotive - Loisdale / Springfield
New Construction, Infrastructure - 52,000 SF
Pending Verification
$30,000,000 CJ est. value
Springfield, VA 22150

Somos at Tyson Multi-Residential
Demolition, New Construction, Infrastructure - 465,000 SF
Pending Verification
$115,000,000 CJ est. value
Tysons, VA 22102

Cub Run Elementary School - Fairfax County
New Construction, Infrastructure
Conception
$36,519,000 CJ est. value
Centreville, VA 20120

Mosaic Elementary School - Fairfax County
Addition, Renovation, Infrastructure
Design
$37,907,334 CJ est. value
Fairfax, VA 22031

Street and Sidewalk Sweeping Services
Infrastructure
Post-Bid
Fairfax, VA

Last Updated 11/22/2022 05:35 PM
Project Title

Park Street Sidewalk Project (VDOT)

Physical Address View project details and contacts
City, State (County) Vienna, VA 22180   (Fairfax County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $285,070 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This project will complete the sidewalk along the east side of Park Street NE between Ayr Hill Avenue NE and Albea Court NE. This project will install curb-&-gutter and sidewalk within the public right-of-way from approximately 320 linear feet south of the intersection of Albea Ct. and Park St to the intersection of Park St and Ayr Hill Ave NE. The work includes new curb & gutter, milling and overlay, sidewalk, driveways and entrance aprons, and an ADA access (pedestrian) ramp. The project will provide pedestrian access and curb-&-gutter along this northern section of Park St. The scope of this project includes the following items of work on the installation of the curb-&-gutter and sidewalk along Park St. All inquiries/questions should be made, in writing, to Jerry Amacker, Procurement Officer, at jerry.amacker@viennava.gov by October 25, 2022, AT 2:00 PM. Questions received after the deadline will not be answered. A prime contractor shall not be precluded from requiring each subcontractor to furnish a payment bond with surety thereon in an amount equal to 100% of the contract with such subcontractor. LOCATION OF WORK Park Street NE between Albea Court NE and Ayr Hill Avenue NE. The required Bid Security provided as Cash, Cashier's Check, Certified Bidder's Check, or an acceptable Bid Bond. **All bidders must sign and date any issued addendums or any other documentation considered to be part of the Bid Package. KEEP A COPY OF THE IFB FOR YOUR FILES AND DO NOT SUBMIT IT WITH THE BID PACKAGE DBE PERCENTAGE GOAL: 12%, MBE (28.0%), WBE (6.9%)

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents