Similar Projects
300,000 Gallon Water Tower
Infrastructure
Bidding
$3,000,000 est. value
KS

Sanitary Sewer to serve Tru-Building Addition
Infrastructure
Bidding
$300,000 CJ est. value
Wichita, KS 67202

Planeview Water Main Replacement with Customer Service Line Replacement Planeview Subdivision No.1
Infrastructure
Post-Bid
Wichita, KS

Piping Improvements and Water Meter Replacement Work
Infrastructure
Post-Bid
Wichita, KS 67206

Water Distribution System to serve Firefly Way Addition Phase 5
Infrastructure
Results
Wichita, KS

Water Distribution System to Serve the Entrance of NRD Addition
Infrastructure
Results
Wichita, KS

Riverfront Village
New Construction, Infrastructure - 512,000 SF
Pending Verification
$127,000,000 CJ est. value
Wichita, KS 67202

Take 5 Express Carwash / Wichita
New Construction, Infrastructure - 3,897 SF
Pending Verification
$1,000,000 CJ est. value
Wichita, KS 67217

Water, Sewer, and Storm Water for Cedar Ranch Estates Phase 2
Infrastructure
Bidding
$500,000 est. value
Derby, KS

Waterline in 53rd Street North Northgate 5th Addition
Infrastructure
Post-Bid
Wichita, KS

Water Distribution System to serve Hogan Chism Addition
Infrastructure
Results
Wichita, KS

Osage Road Water Line Replacement
Alteration
Bidding
$200,000 est. value
Derby, KS 67037

Valves - Angle and Brass Low Lead
Infrastructure
Post-Bid
Wichita, KS

9th Street - Random North Neighborhood Water Main Replacement - Phase A
Infrastructure
Results
Wichita, KS

Water Distribution System to Serve Turkey Creek 4th Addition Phase 1B
Infrastructure
Bidding
$700,000 est. value
Wichita, KS

Last Updated 07/25/2022 01:03 PM
Project Title

SWS 766 Central and I135 SWS Repair

Physical Address View project details and contacts
City, State (County) Wichita, KS 67202   (Sedgwick County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $119,875 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Bid Bond in the Amount of Five Percent (5%) Of the Total Bid or an Annual Bid Bond Is Required Prior to Bid Opening. There will be no pre-bid conference. Bidder questions must be submitted by email to the Engineer by one week prior to bid date. The City reserves the right to refuse to award the project to a prospective bidder if the bidder is in default for any of the following reasons Failure to comply with any prequalification regulations of the City, if such regulations are cited, or otherwise included, in the proposal as a requirement for bidding. The Contractor shall be required to meet the DBE goal as designated in the respective bid proposal.Pipe Backfill All box culvert, storm sewer, duct bank, waterline and sanitary sewer excavation under proposed pavement shall be sand filled and flushed (jetted and vibrated) per City Standard Specifications (section 801), unless flowable fill or other improved backfill material is otherwise specified. The sand fill shall start at the top of improved bedding and be brought up uniformly to an elevation 12 inches above the top of pipe, or 2 feet below the bottom of proposed pavement, whichever is higher. However, in no instance shall the sand fill be brought up to less than 6 inches below the pavement subbase material. Storm sewer adjacent to the back of curb and sanitary sewer in front and side lots shall also be sand filled per this provision, to within 2 feet of final grade. All costs for sand filling and flushing shall be included in the unit price bid for "Fill, Sand (Flushed & Vibrated)". This item shall be paid for at the unit price bid per linear foot of trench filled, regardless of trench depth and/or pipe size, unless indicated otherwise by the plans or contract.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents