Similar Projects
Dooley Court
Bidding
$1,097,130 est. value
Salt Lake City, UT 84102

On-Call Task Order General Construction Services FY 19/20
Term Contract
Post-Bid
Salt Lake City, UT

1800 North Sewer Realignment
Post-Bid
Salt Lake City, UT 84116

2018 West Jordan Manhole Raising Project
Results
$161,900 est. value
West Jordan, UT

104th and Bangerter Relocation
Term Contract
Results
Less than $1,300,000 est. value
Bluffdale, UT 84065

19D: Large Meter Replacement Project
Post-Bid
West Valley City, UT

Installation and Repair of Sanitary Sewer Facilities
Results
Less than $125,000 est. value
Salt Lake City, UT

Manhole Lids, Rings, Monuments and Related Items
Term Contract
Post-Bid
Salt Lake City, UT

MP15 - 700 South Interceptor Capacity Upgrade and 700 South Water Main
Results
Less than $3,293,600 est. value
Salt Lake City, UT 84115

Cougar Lane Outfall 2A Sewer Relief Project
Post-Bid
Kearns, UT 84118

2018/2019 Various CIPP and Point Repair, Phase 1
Results
Less than $1,000,000 est. value
Salt Lake City, UT

Waste Water Sewer Cleaning and Maintenance
Term Contract
Post-Bid
Salt Lake City, UT 84114

Sewer Rehabilitation
Results
Less than $400,000 est. value
Salt Lake City, UT 84119

Drain Cleaning Services
Term Contract
Post-Bid
Draper, Ogden, Orem, Salt Lake City, West Valley City, UT 84020

Millcreek Guard Station Septic System Replacement
Results
Salt Lake City, UT

Last Updated 11/18/2020 04:07 AM
Project Title

Mp3.1A - East - West Conveyance Line

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT 84104   (Salt Lake County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $8,117,206
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The location of the work is: In Salt Lake City along Ashton Avenue, 900 East, Forest Dale Golf Course, Wood Hollow Condominiums and Warnock Avenue. Work is also along 700 East from I-80 south to 2700 South, Salt Lake City, Utah. The work to be performed consists of furnishing and installing the equipment, facilities, services, and appurtenances indicated in the Contract Documents. The Work generally includes, but is not limited to, the following: Installation of approximately 3,300 feet of 48” welded steel pipe, crossing of the Jordan & Salt Lake Canal with 50 feet of 60” steel casing within the restricted time frame, construction of a flow control vault and all requirements of the vault, removal of 350 feet of 8” sanitary sewer, installation of approximately 58 feet of relocated 8” sanitary sewer, replacement of approximately 110 feet of 4” waterline with new 8” pipe, lining of approximately 1,900 feet of 10” sanitary sewer, relocation of storm drain cleanout box and a temporary parking lot, also landscaping restoration and final surfacing of golf course, parking areas and roadways.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents