Similar Projects
On-Call Duct Bank
Post-Bid
$10,000,000 est. value
Boston, MA

Replacement of Two Rooftop HVAC Units
Alteration
Post-Bid
Canton, MA 02021

Emergency Smoke Control Tunnel Fans
Term Contract
Results
Boston, MA

Air-Conditioning (HVAC) Equipment and Systems
Results
Boston, MA

Five (5) Trade Contractor Packages - Sub-Bids
Alteration
Post-Bid
$15,557,060 est. value
Boston, MA

Boiler and Water Heater Service. Contractor Category: HVAC; Mechanical Systems.
Alteration
Results
Less than $366,250 est. value
Boston, MA

Mccormack Building, 8th Floor Reconfiguration - Sub-Bids
Alteration
Post-Bid
$836,406 est. value
Boston, MA

Steam Boiler Replacement Project Walnut Street Apartments
Alteration
Results
$166,000 est. value
Brookline, MA 02445

Air Conditioners
Alteration
Post-Bid
Boston, MA

Hurley/Lindemann Building Cooling Separation - General Bids
Alteration
Results
$1,455,652 est. value
Boston, MA

Unit Ventilators
Alteration
Post-Bid
Canton, MA

Owner's Project Manager (OPM) for the Norwood Public Safety HVAC Improvements
Alteration
Results
$3,500,000 est. value
Norwood, MA 02062

Replacement of 10 Unit Ventilators at Galvin Middle School
Alteration
Post-Bid
Canton, MA 02021

Time and Materials Contract to Service and Repair the Heating, Ventilating and Air Conditioning Systems
Alteration
Results
$450,000 est. value
Stoughton, MA

HVAC Repair and Maintenance Services
Term Contract, Alteration
Post-Bid
Millis, MA 02054

Last Updated 11/17/2022 01:18 PM
Project Title

Memorial Village Hud Development Boiler Replacement Project

Physical Address View project details and contacts
City, State (County) Stoughton, MA 02072   (Norfolk County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Results, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $214,300 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

As of November 17, 2022 , this project has not yet been awarded. The project is expected to be awarded on November 29, 2022. The Stoughton Housing Authority invites HVAC Contractors to submit Bid Proposals for the Boiler Replacement Project at the Federal Development Memorial Village in Stoughton, Massachusetts. General bidders must be certified by the Division of Capital Asset Management and Maintenance (DCAMM) in the Heating, Ventilating and Air Conditioning (HVAC) category. Bidders must include a current DCAMM Certificate of Eligibility and a signed DCAMM Update Statement. The Project consists of: Removal and replacement of existing heating boilers in three separate buildings and at the community building at the Stoughton Housing Authority's Memorial Village development. General bids and sub-bids shall be accompanied by a bid deposit that is not less than five percent (5%) of the greatest possible bid amount in the form of a bid bond, certified check, treasurer's check or cashier's check issued by a responsible bank or trust company made payable to the Taunton Housing Authority. The Bid Deposit shall be satisfactory to the Awarding Authority and conditioned upon the faithful performance by the principal of the agreements contained in the Bid. This deposit will be refunded for up to two sets for general bidders upon return of the sets in good condition within thirty (30) days of receipt of general bids. Otherwise the deposit shall be the property of the Awarding Authority. Additional sets may be purchased for $50.00 Bidders requesting Contract Documents to be mailed to them shall include a separate check for $40.00 per set for UPS Ground (or $65.00 per set for UPS Overnight), payable to Portal.to cover mail handling costs. Bids and the Contract are subject to: M.G.L. c.149 44A-J and to minimum wage rates as required by M.G.L. c.l49 26 to 27H inclusive, Housing and Urban Development Act of 1968, Equal Opportunity provisions of Executive Order 11246, Non-Discrimination provision of Title VI of the Civil Rights Act of 1964, Labor Standards of the Davis-Bacon Act and related acts and Contract Work Hours Standard Act, and prevailing wage determinations as issued by the U.S. Secretary of Labor. The work performed under this contract is funded in part through the Housing and Community Development Act of 1974 and is subject to all provisions and regulations issued pursuant to this act. This project is covered by Section 3 of the HUD Act of 1968. All Bids for the project are subject to the provisions of the Massachusetts General Laws (Ter. Ed.), Chapter 149, Sections 44A to 44L inclusive as amended. RIGHT OF THE AWARDING AUTHORITY TO REJECT BIDS The right is reserved by the Taunton Housing Authority to reject any or all Bids, if it be in their interest to do so. MINIMUM WAGE RATES Bids are subject to M.G.L. c.149 44A-J and to minimum wage rates as required by M.G.L. c.l49 26 to 27H inclusive and to the Federal Davis-Bacon wage rates and Related Acts and shall pay the higher of the two rates

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents