Similar Projects
Reported | 06/10/2022 12:00 AM |
Project Title | TRIP Project - HMA Paving including Pulverizing, Base Prep work and Shouldering |
Physical Address | View project details and contacts |
City, State (County) | Iron Ridge, WI 53035 (Dodge County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Bidding, Construction Start Expected July 2022 |
Bids Due | View project details and contacts |
Estimated Value | $70,000 [brand] Estimate |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Full depth pulverization of existing pavement, water, grade and compact. Pave a 3" compacted thickness to be done in two lifts using 4LT 58-28 S Hot Mix asphalt and install a 2-foot shoulder. Price to include paving into driveways and approaches. Madison Rd - STH 33 to Zion Church Rd (Termini) - 1.00 mi x 21 ft For the following materials and services for 2022 TRIP Project HMA Paving including Pulverizing, Base Prep work and Shouldering. Madison Rd - STH 33 to Zion Church Rd (Termini) - 1.00 mi x 21 ft A copy of the road work bid list must be filled out as is and included in any bid to be considered. Contractor must supply town with proof of insurance The Town reserves the right to accept or reject any or all bids. There is a completion deadline for all projects of October 1, 2022 A letting of the work described herein is subject to the provision of 66.0903 Wisconsin Statutes relating to wage rates payable on the work |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |