Similar Projects
Fire Pumps and DW Pumps Maintenance and Repair
Term Contract
Bidding
Atlanta, GA 30303

Buddy Spann Park Well No. 5 (105)
Bidding
Hazlehurst, GA

Contract A - Well and Chemical Feed Building
Post-Bid
Fort Valley, GA 31030

One Portable Diesel Pump
Post-Bid
Valdosta, GA 31603

Green Infrastructure Design Challenge - Continental Colony Elementary
Results
Atlanta, GA 30331

Wastewater Flow Measurement Stations
Results
Covington, GA 30016

New 30,000 Gallon Draft Pit
Bidding
Valdosta, GA 31606

Well Maintenance
Term Contract
Post-Bid
Savannah, GA 31401

Pond Springs Road Test Well with Production Option
Results
Chickamauga, GA

Bypass Pump Station And Force Main Alternate Route
Bidding
GA

Wet Well Cleaning and Disposal
Term Contract
Post-Bid
Gainesville, GA 30501

Primary Chill Water Pumps Replacement
Results
Savannah, GA

Harbins Park Well Services
Post-Bid
Dacula, GA 30019

Effluent Pump Station Pump Replacement
Results
Less than $100,000 est. value
Camilla, GA 31730

2020 Water System Improvements - Andrews Well 2
Post-Bid
Carnesville, GA 30521

Reported 07/22/2020 12:00 AM
Project Title

Deep Well and Chemical Feed Building

Physical Address View project details and contacts
City, State (County) Pavo, GA 31778   (Brooks County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $600,000
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of constructing a new deep well to the depth and diameter detailed in the project Specifications and Construction Plans and constructing a chemical feed building. The project shall include, but is not limited to, providing all labor, equipment and materials to construct the project including test well, pump, motor, valves, yard piping, painting, electrical, generator, video, logging and performing a 24-hour pump test, disinfection, driveway, fencing, site grading and all associated appurtenances required for a complete project. Minimum depth is expected to be ±500 feet.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents