Similar Projects
Chemical Water Treatment Services for HVAC Systems
Term Contract
Post-Bid
Raleigh, NC 27623

Police Headquarters HVAC Replacement
Post-Bid
Raleigh, NC

DPS - Morrison Aggrey Dorm Heating System Replacement
Results
Raleigh, NC 27699

Repairs to Greenhouse/Headhouse Ventilation and Cooling Systems Raleigh NC
Results
Raleigh, NC 27695

HVAC Upgrades to Thomas Hall
Post-Bid
Less than $500,000 est. value
Raleigh, NC 27607

Nature Exploration Center (NEC) Building HVAC Control System Replacement
- 200,000 SF
Results
Less than $1,090,000 est. value
Raleigh, NC 27601

Police Department Headquarters HVAC Replacement
Post-Bid
Raleigh, NC 27615

Cameron Village Library DDC Controls Replacement
Results
Raleigh, NC 27600

Air Cooled Chillers Building Automation Lab
Post-Bid
Raleigh, NC

Chiller Replacement - Lee Hall
Term Contract
Results
Less than $600,000 est. value
Raleigh, NC 27600

Chiller Installation and Repair
Term Contract
Post-Bid
Raleigh, NC

Rooftop Air Handlers Replacement
Results
$362,139 est. value
Raleigh, NC 27604

HVAC Installation and Repair
Post-Bid
Raleigh, NC

Construction of HVAC and Electrical Renovations for Rock Quarry Road Auxiliary Services
Results
Raleigh, NC 27610

Replace Air Cooled Chiller
Alteration
Post-Bid
Raleigh, NC

Reported 02/23/2022 12:00 AM
Project Title

NCSU - HVAC Renovation Matsumoto Wing - Brooks Hall

Physical Address View project details and contacts
City, State (County) Raleigh, NC 27605   (Wake County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $565,000
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project shall provide improved indoor air quality through ventilation and humidity control. The scope of work shall include demolition of existing fan coil units (FCUs) and piping and the installation of new FCUs (four pipe) for both heating and cooling and a dedicated outside air supply unit to precondition the ventilation air. This project is designed and specified to add a rooftop dedicated outdoor air handler (DOAH) on the roof of Brooks Hall Matsumoto Wing located at NC State University’s main campus. The DOAH will provide ventilation air and relief air to the second and third floors of the Matsumoto Wing that currently do not have mechanical means of outdoor air ventilation. Equipment is sized to provide future capacity for first floor ventilation for use in future renovation projects. The DOAH includes a total enthalpy energy recovery wheel in addition to chilled water cooling coil and a steam reheat coil to deliver dehumidified neutral temperature air into the facility.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents