Similar Projects
South College Avenue Stormwater Detention Facility Construction
Infrastructure
Conception
$417,000 est. value
Bryan, TX

8" Water East Fork Line - Town of Sunnyvale
Infrastructure
Conception
$3,000,000 CJ est. value
Sunnyvale, TX 75182

Great Wolf Lodge Resort / Webster
New Construction, Infrastructure - 400,000 SF
Design
$150,000,000 CJ est. value
Webster, TX 77598

2021 Bond Program Campus Impovements
Addition, Demolition, Renovation, Infrastructure
Bidding
$43,867,741 CJ est. value
Burton, TX 77835

Street Rehabilitation - Tanglewood/briarwood Phase 1B and Sidewalk - San Jacinto Street and North Thompson Street
Infrastructure
Bidding
$4,030,242 CJ est. value
Conroe, TX 77301

Mckinney Municipal Complex
New Construction, Infrastructure - 173,000 SF
Post-Bid
$95,000,000 CJ est. value
McKinney, TX 75069

Joines Road Deep Well No. 1 and 2
New Construction
Post-Bid
San Benito, TX 78586

Manvel Town Center Water Line Interconnect
Results
Manvel, TX 77578

BNSF Railroad 18" Water Line Phase 1 and Phase 2
Results
Waxahachie, TX

Bay Colony Lift Station Expansion Phase I
Construction
League City, TX 77573

Stephenville Climate Controlled Self Storage
New Construction, Infrastructure - 69,777 SF
Pending Verification
$2,860,000 CJ est. value
Stephenville, TX 76401

Line 204 Studios-Stage A
New Construction, Infrastructure - 22,740 SF
Pending Verification
$7,000,000 CJ est. value
Bastrop, TX 78602

Water Distribution, Wastewater Collection, Storm Water Facilities And Paving To Serve Chambers Creek, Section 6A
Infrastructure
Bidding
$2,000,000 CJ est. value
Conroe, TX 77304

Advanced Metering Infrastructure (AMI) System
Post-Bid
McKinney, TX

Design Build - Edinburg Pump Station
New Construction
Results
$5,000,000 to $10,000,000 est. value
Edinburg, TX

Last Updated 09/21/2022 05:08 AM
Project Title

Hallettsville North EDC Property Utilities Services

Physical Address View project details and contacts
City, State (County) Hallettsville, TX 77964   (Lavaca County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $1,944,762 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Hallettsville has established a target commencement date for construction activities as September 23, 2022. The projected completion date is estimated to be September 18, 2023. The City of Hallettsville reserves the right to phase the construction of the Project or modify the schedule as needed and determined by the City of Hallettsville due to modifications in scope. The facility will be located on US 77, approximately 0.6 miles north of the City of Hallettsville City Limits. Principal items of construction will consist of 5,268 LF of 8" PVC water line, 2,073 LF of 6" PVC water line, 3,305 LF of 10" gravity sewer, 632 LF of 6" wastewater force main, wastewater lift station and all other appurtenances necessary for the complete project. It is the responsibility of the Contractor bidding to use proper scaling, paper width and length, etc. Failure to do so may result in error in the Unit Bid Quantities and/or Bid Amounts.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents