Similar Projects
Removal of Compressor and Tanks, Cleanup Mechanic Room
Renovation, Alteration
Design
Jackson, MS 39216

Plumbing and Mechanical Services
Alteration
Bidding
University, MS

Drinking Fountain Upgrades
Alteration
Bidding
$550,000 est. value
Ridgeland, MS

Phase II Various Mechanical Work - MGCCC
Post-Bid
Perkinston, MS 39573

Walk In Cooler/Freezer Combo
Post-Bid
Verona, MS 38879

Pearl Mechanical Renovations
Alteration
Results
$1,339,000 est. value
Pearl, MS 39208

DCS County Office Boiler Replacement
Alteration
Results
$89,945 est. value
Hernando, MS 38632

Marty Stuart Congress of Country Music - Ellis Theater Renovations
Alteration
Construction
Philadelphia, MS 39350

Walk in Coolers and Freezers
Alteration
Post-Bid
Tupelo, MS

Pearl Mechanical Renovations - Lower and Upper Elementary
Alteration
Results
Pearl, MS 39208

Aeration and Water Fountains
Alteration
Post-Bid
Mississippi State, MS

District One Bottle Filler Replacement Project
Alteration
Results
$599,000 est. value
Hernando, Olive Branch, Southaven, MS 38672

Walk-In Freezer and Installation
Alteration
Post-Bid
MS

District Three Bottle Filler Replacement Project
Alteration
Results
Hattiesburg, Hernando, Lake Cormorant, Walls, MS 39402

Yalobusha General Hospital Boiler Replacement
Alteration
Post-Bid
Water Valley, MS 38965

Last Updated 06/27/2022 03:34 AM
Project Title

Overhaul of Chiller 1

Physical Address View project details and contacts
City, State (County) Stoneville, MS 38776   (Washington County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Recovery of refrigerant and oil. pull compressors and overhaul including installation of new high and low speed bearings. cleaning oil sump and installing recovered and filtered refrigerant. new oil filter and refrigerant filters. Reinstalling compressor and motor and performing startup This project is to overhaul the chiller and replace worn parts and components to extend the service life of the unit. The current chiller is a York unit and will require York OEM parts so they can integrate seamlessly into the unit and perform on a basis consistent with the design of the unit. All work associated with this requirement, shall be performed by a York Certified Industrial HVAC Contractor. Any response received that is not in compliance with these requirements will be consider non-responsive and will not be accepted.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Packaged Water Chillers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents