Similar Projects
Last Updated | 06/27/2022 03:34 AM |
Project Title | Overhaul of Chiller 1 |
Physical Address | View project details and contacts |
City, State (County) | Stoneville, MS 38776 (Washington County) |
Category(s) | Single Trades |
Sub-Category(s) | Mechanical |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Recovery of refrigerant and oil. pull compressors and overhaul including installation of new high and low speed bearings. cleaning oil sump and installing recovered and filtered refrigerant. new oil filter and refrigerant filters. Reinstalling compressor and motor and performing startup This project is to overhaul the chiller and replace worn parts and components to extend the service life of the unit. The current chiller is a York unit and will require York OEM parts so they can integrate seamlessly into the unit and perform on a basis consistent with the design of the unit. All work associated with this requirement, shall be performed by a York Certified Industrial HVAC Contractor. Any response received that is not in compliance with these requirements will be consider non-responsive and will not be accepted. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |