Similar Projects
On-Call Task Order General Construction Services FY 19/20
Term Contract
Post-Bid
Salt Lake City, UT

Culinary Water Improvements
Post-Bid
Less than $700,000 est. value
Levan, UT 84639

Z--Dino - Design/Build, Replace Water Line
Results
$500,000 to $1,000,000 est. value
Jensen, UT 84035

Bryner Ploutz Pipeline
Results
$50,000 to $100,000 est. value
Helper, UT 55101

18” Well Transmission Pipeline Project - Materials Supply
Post-Bid
Hurricane, UT 84737

Construction of the 2019 Fire Flow Projects
Results
UT

Continental Drive Reconstruction Project
Post-Bid
Less than $690,000 est. value
Farmington, UT 84025

Decommissioning Water Systems
Results
$50,000 to $100,000 est. value
Price, UT 84501

19D: Large Meter Replacement Project
Post-Bid
West Valley City, UT

Spanish Fork Ne Irrigation Pipeline
Results
Spanish Fork, UT

Excavation and Water System Repair Services
Term Contract
Post-Bid
Park City, UT 84060

2019 Public Works Project
Results
Hyrum, UT 84319

2020 Water Line Projects - 100 E, 200 E, and 300 E
Post-Bid
Midway, UT 84049

MP15 - 700 South Interceptor Capacity Upgrade and 700 South Water Main
Results
Less than $3,293,600 est. value
Salt Lake City, UT 84115

Construction of 625 West Waterline Replacement
Post-Bid
Bountiful, UT 84010

Reported 02/23/2021 12:00 AM
Project Title

Water Improvement Project 2020 Pipeline, Booster Pump Station and PRV Vault

Physical Address View project details and contacts
City, State (County) Hyde Park, UT   (Cache County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The new pipeline will be installed to connect Hyde Park City`s existing 1.0 MG Longhill (SV) Tank, the new 2.0 MG Hyde Park Canyon Tank, and the existing 0.5 MG Greystone Tank. The pipe will be placed in approximately 2.3 miles of new trench along existing dirt access roads and ATV trails, underneath the existing powerlines, and in previous undeveloped areas. The new pipe will include air/vacuum release valves, isolation gate valves, one PRV vault, and other necessary fittings and appurtenances shown in the drawings. A new pump house will be built at the Greystone Tank site with the approximate dimensions of 25 ft by 27 ft with two new 100 HP in-line booster pumps. An existing chlorine building at the Longhill Tank will be retrofitted to treat the new tank`s water.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents