Similar Projects
Schaeffler Group Addition / Wooster
Addition, Infrastructure - 89,595 SF
Conception
$48,100,000 CJ est. value
Wooster, OH 44691

Schaeffler Group Addition / Wooster
Addition, Infrastructure - 89,595 SF
Conception
$48,100,000 CJ est. value
Wooster, OH 44691

SR 134 - Bridge Preservation
Demolition, New Construction, Infrastructure
Design
$530,000 CJ est. value
Martinsville, OH 45146

SR 134 - Bridge Preservation
Demolition, New Construction, Infrastructure
Design
$530,000 CJ est. value
Martinsville, OH 45146

Chip and Sealing
Infrastructure
Post-Bid
Wooster, OH

Road Materials Furnished and Applied for 2022
Term Contract, Infrastructure
Post-Bid
Wooster, OH 44691

2021 City of Orrville Kirk Avenue Resurfacing
Results
$59,530 est. value
Orrville, OH 44667

Hot Mix Leveling
Results
Doylestown, OH

Melrose Drive Residential Development
New Construction, Infrastructure
Pending Verification
$31,500,000 CJ est. value
Wooster, OH 44691

Melrose Drive Residential Development
New Construction, Infrastructure
Pending Verification
$31,500,000 CJ est. value
Wooster, OH 44691

South Market Street Mixed Use Building
New Construction, Infrastructure
Design
$1,000,000 CJ est. value
Wooster, OH 44691

Chip and Seal and/or Motor Paving
Infrastructure
Post-Bid
Wooster, OH

Chip and Seal
Results
Doylestown, OH

Roadway Minor Rehab - US 250
Infrastructure
Design
$1,674,950 CJ est. value
Wooster, OH 44691

Chip and Seal
Infrastructure
Post-Bid
Marshallville, OH

Last Updated 11/02/2022 02:31 PM
Project Title

Noble Drive Apartments

Physical Address View project details and contacts
City, State (County) Wooster, OH 44691   (Wayne County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $11,300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope includes the new construction of ten, three unit buildings. Scope details have not been released. As of November 2, 2022 the project is in planning and seeking final development plan approval from the City of Wooster Planning Commission. A meeting was held October 6, 2022, but the results are not yet available. The Commission approved a preliminary development plan and conditional use permit on September 1, 2022, but the results are not yet available. Information regarding the architect, general contractor and method of selection has not been disclosed. The construction timeline has not been determined, but is not expected to begin before the spring of 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

2 Stories Above Grade, New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents