Similar Projects
Glen Helen Lighting Construction Project
Infrastructure
Sub-Bidding
$346,000 CJ est. value
San Bernardino, CA 92407

13th Street Sports Park - Parking Lot Lighting - Phase 1
Infrastructure
Sub-Bidding
$75,000 CJ est. value
Yucaipa, CA 92399

General Services Main Electrical Upgrade
Alteration
Post-Bid
Highland, CA 92346

General Services Interior Electrical Upgrade Services
Term Contract
Post-Bid
Highland, CA 92346

Generator Maintenance and Repair Services
Term Contract
Results
Fontana, CA

Crafton Hills College Transformer Upgrades Project
Alteration
Results
$1,000,000 est. value
Yucaipa, CA 92399

Sheriff Headquarters Media System
Renovation
Post-Bid
$60,000 CJ est. value
San Bernardino, CA 92408

Redlands Bowl Electrical And Theatrical Lighting Upgrade
Renovation
Results
$1,416,972 CJ est. value
Redlands, CA 92373

Electrical Supplies on an as Needed Basis
Term Contract
Post-Bid
Rancho Cucamonga, CA 91730

Street Light Pole Replacement Services
Infrastructure
Results
$34,560 CJ est. value
San Bernardino, CA 92401

Electric Vehicle Charging Stations
Term Contract
Post-Bid
Ontario, CA 91762

Village Drive and Tawney Ridge Lane Traffic Signal
Infrastructure
Results
$601,714 CJ est. value
Victorville, CA 92394

Roll Up Construction Signs and Stands
Term Contract
Post-Bid
San Bernardino, CA 92401

District High School Football Scoreboard Replacement
Renovation
Results
$2,925,000 CJ est. value
Chino Hills, CA 91709

As Needed Electrical Services - Employment Development Department
Term Contract
Post-Bid
San Bernardino, CA 92401

Last Updated 12/19/2023 07:07 AM
Project Title

Seventh Street Traffic Signal Modifications & Village Drive at Puesta Del Sol Drive Traffic Signal

Physical Address View project details and contacts
City, State (County) Victorville, CA 92395   (San Bernardino County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected March 2024 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

7th St Traffic Signal Modifications & Village Dr. At Puesta Del Sol Dr Traffic Signal, Project CC24-032 (the "Project"). The Project includes the following scope of Work: modification of five (5) existing traffic signals along Seventh Street from Lorene Drive to B Street and the construction of a new, fully operational traffic signal at the intersection of Village Drive and Puesta Del Sol Drive. The Work will further include associated temporary traffic control, potholing, underground utility trenching/boring, pull box replacement, fiber optic cable installation, concrete removal and replacement. Question Deadline 01/05/2024 at 12:00 PM PT All questions, other than those asked at the pre-bid meeting and not specifically addressed within the Contract Documents, must be submitted in writing to Celeste Calderon Finance Specialist 760 955-5082 cmcalderon@victorvilleca.gov Bids shall be submitted in a SEALED ENVELOPE clearly marked "ATTENTION: FINANCE DEPARTMENT/PURCHASING SECTION: BID FOR SEVENTH STREET TRAFFIC SIGNAL MODIFICATIONS & VILLAGE DRIVE AT PUESTA DEL SOL DRIVE TRAFFIC SIGNAL, CC24-032" and shall be accepted at Victorville City Hall's main entrance, 14343 Civic Drive, Victorville, CA 92392, until THURSDAY January 11, 2024 AT 3:00 pm PST The Engineer has calculated an estimate of probable construction costs for this Project. The City does not wish to publicize the engineer's estimate of the project cost since this information may tend to influence the number and nature of bids received. However, for the bidder's convenience, the City will publicize that the engineer's estimate for the base bid falls within a range of $2,700,000.00 to $3,000,000.00. : Each Bid Proposal shall be accompanied by: (a) cash; (b) a certified or cashier's check; or (c) a bidder's bond made payable to City of Victorville in an amount equal to ten percent (10%) of the Total Base Bid as bid security. Said Bid Guaranty shall be enclosed in the same envelope as the Bid Proposal and no bid shall be considered unless such Bid Guaranty is enclosed therewith. The successful Bidder will be also required to furnish performance and payment bonds, each in an amount equal to one hundred percent (100%) of the Total Base Bid. Bidders must be licensed in accordance with the "Contractor's License Law," Chapter 9 of Division 3 of the California Business and Professions Code. At the time of submitting the bid, Bidders must possess a valid Class A California Contractor's License The goal of these specifications for installing accessible pedestrian signals (APS) is to comply with the California MUTCD and American with Disabilities Act (ADA) and to provide pedestrians with disabilities additional accommodations Any contract for the Project will be awarded to the lowest responsive, responsible Bidder as determined by the City using the amount of the Total Base Bid for bid comparison purposes. Such award, if made, shall be made within ninety (90) calendar days after opening of the bids. The City reserves the right to reject any or all bids or to waive any irregularities or informalities in any bids or in the bidding process *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. $2,700,000.00 to $3,000,000.00.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents