Similar Projects
Weed Spray in Various locations in District 1
Infrastructure
Bidding

Fire Station No. 3 Driveway Replacement
Infrastructure
Bidding
Aurora, IL 60506

DHS/Elgin Mental Health Center Elevator R&M
Term Contract
Post-Bid
Elgin, IL 60123

Naturalized Landscape Maintenance Services 2021-2023
Term Contract
Post-Bid
Montgomery, IL 60538

Pavement Improvements
Renovation
Results
Sugar Grove, IL 60554

Main Wastewater Facility Fence Replacement
Results
Saint Charles, IL 60174

VNA Health Care Parking Area
Alteration
Construction
Aurora, IL 60506

2022 MFT Asphalt Patching
Infrastructure
Bidding
Algonquin, IL

2021 Water & Sewer Division Emergency Repair
Term Contract
Post-Bid
Aurora, IL 60505

Traffic Signal Modernization and ADA Curb Ramp Improvements
Results
Elgin, IL

2021-2022 Plumbing On Call Services
Term Contract
Post-Bid
Elgin, IL 60120

Smart Overlay, ADA Improvements and Milled Rumble Strips
Results
Aurora, IL 60502

Herbicide Control of Reed Canary Grass at Seven (7) Forest Preserves
Post-Bid
Geneva, IL

2021 Plumbing Services
Term Contract
Results
Aurora, IL 60505

Herbicide Control of Canada Thistle
Post-Bid
Geneva, IL

Reported 02/18/2022 12:00 AM
Project Title

2022 Annual City Landscaping Repair and Maintenance

Physical Address View project details and contacts
City, State (County) Aurora, IL   (Kane County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Fencing, Landscaping, Service/Term Contracts, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed work shall consist of landscape restoration of various locations in the City involving but not limited to: seeding and sod, tree, shrub, and groundcover planting, topsoil placement, mulching, supplemental watering, and may include some sidewalk, brick paver, fencing, and other appurtenant work related to landscaping as they arise throughout the City of Aurora. The contract will begin in April 2022 and continue for two (2) years and nine (9) months with two one-year extensions based on mutual agreement between the contractor and the City of Aurora Division of Engineering.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents