Similar Projects
Kwik Trip / Reedsburg
New Construction, Infrastructure
Conception
$3,000,000 CJ est. value
Reedsburg, WI 53959

Hillsboro - Reedsburg Const / Mill and Overlay
Infrastructure
Conception
$5,000,000 CJ est. value
Reedsburg, WI 53959

Waldo Street Condominiums
New Construction, Infrastructure
Design
$32,000,000 CJ est. value
Baraboo, WI 53913

J's Pub and Grill - Outside Addition
Addition, Renovation, Infrastructure
Design
$100,000 CJ est. value
Reedsburg, WI 53959

Well No. 1 Well House Improvements
Renovation, Infrastructure
Bidding
$2,500,000 CJ est. value
Merrimac, WI 53561

Village Forest Park Phase 3
Infrastructure
Bidding
$500,000 CJ est. value
Baraboo, WI 53913

Lake Redstone Swallow Bay Spillway Restoration
Infrastructure
Post-Bid
La Valle, WI

Well Drilling Services
Infrastructure
Post-Bid
WI

Building Demolition and Site Grading
Demolition, Infrastructure
Results
North Freedom, WI

Baraboo and Reedsburg Facilities
New Construction, Infrastructure - 164,640 SF
Results
$10,000,000 CJ est. value
Baraboo, Reedsburg, WI 53913

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Pelton Apartments
New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Reedsburg, WI 53959

Ironton - Woodland (CTH G) Constr OPS / Pavement Replacement
Infrastructure
Design
$3,000,000 CJ est. value
Ironton, WI 53941

Village Forest Park Project - Playground Development
Infrastructure - 2,500 SF
Post-Bid
$540,000 CJ est. value
Baraboo, WI 53913

2021 Vault Toilet Replacement Group 2
Demolition, New Construction, Infrastructure
Results
$278,000 CJ est. value
Baraboo, WI 53913

Last Updated 11/16/2022 12:14 PM
Project Title

Village Forest Park Phase 2 - Pavilion Building

Physical Address View project details and contacts
City, State (County) Baraboo, WI 53913   (Sauk County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Misc. Recreational, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $900,800 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The work for which bids are asked includes the following: This package is for the Phase 2 construction at Village Forest Park on Zajak Drive in West Baraboo, Wisconsin. The project includes a new seasonal park building with restrooms and covered gathering areas. Site work is limited to that needed for the immediate building area. The building includes concrete foundations, masonry walls and wood roof trusses. The remaining surrounding park development will be constructed simultaneously to this project and be included in other bid packages. The anticipated Substantial Completion date is July 11, 2023 and Final Completion date is August 24, 2023. No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the OWNER as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. 1230 South Boulevard, Baraboo, WI 53913The certified check or bid bond will be returned to the bidder as soon as the contract is signed, and if after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the OWNER as liquidated damages. No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the OWNER as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. 1230 South Boulevard, Baraboo, WI 53913The certified check or bid bond will be returned to the bidder as soon as the contract is signed, and if after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the OWNER as liquidated damages. No bid may be withdrawn within 60 days after the actual date of the opening thereof. The minimum wages to be paid on the project shall be in accordance with Federal Davis Bacon Wage Rates. Be aware that project Administrators, Bidders, and Contractors are required to use the latest federal wage rate available at the time of bid opening. This project anticipates the use of Community Development Block Grant (CDBG) Funding. Attention of Bidders is particularly called to the requirements as to conditions of employment to be observed and minimum wage rates to be paid under the contract, Section 3, Segregated Facility, Section 109 and E.O. 11246. OWNER reserves the right to waive any informalities or to reject any or all bids. Published by the authority of the Village Of West Baraboo.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents