Similar Projects
Roadway Minor Rehab - SR 11
Infrastructure
Design
$3,250,000 CJ est. value
Jefferson, OH 44047

Roadway Minor Rehab - US 322
Infrastructure
Design
$2,076,000 CJ est. value
East Orwell, OH 44076

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

2021 Loudonville AMR Water Meter Replacement Project
Infrastructure
Post-Bid
$280,000 est. value
Loudonville, OH

Bishopville Booster Station Replacement
Renovation
Post-Bid
$375,000 est. value
Glouster, OH 45732

Pump Station Replacement for Mumaugh Road and Cable Road
Results
Lima, OH

Panhandle Sanitary Sewer Improvements Phase 4
New Construction, Infrastructure
Results
$3,700,000 est. value
West Union, OH

US Route 33, US Route 50 Interchange Improvement - County of Athens
Infrastructure
Construction
$7,000,000 CJ est. value
Athens, OH 45701

Kershaw Greene Apartments Phases III & IV
New Construction, Infrastructure
Pending Verification
$32,000,000 CJ est. value
Athens, OH 45701

Lima Community Aquatic Center
New Construction, Infrastructure
Pending Verification
$8,900,000 CJ est. value
Lima, OH 45801

SR 134 - Bridge Preservation
Demolition, New Construction, Infrastructure
Design
$610,000 CJ est. value
Martinsville, OH 45146

Punderson, Pymatuning and West Branch State Park Elevated Water Storage Tank Rehabilitation
Infrastructure
Bidding
$1,300,000 CJ est. value
Andover, OH 44003

Lift Stations Telemetry Upgrade Contract 1 - 2022
Renovation
Post-Bid
$500,000 est. value
Athens, OH

Lima Storage Unit Site Development
Infrastructure
Results
$83,000 est. value
Lima, OH 45806

Last Updated 12/07/2022 01:29 PM
Project Title

Franklin Furnace Booster Pumping Station

Physical Address View project details and contacts
City, State (County) Wheelersburg, OH 45694   (Scioto County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $1,162,080 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of November 30, 2022, this project has not yet been awarded. A timeline for award has not yet been established.** The Project includes the following Work: Installation of a premanufactured booster pumping station and associated piping and appurtenances. The Bid must be accompanied by Bid Guaranty and Contract Bond for the full amount of the Bid or Bid security made payable to OWNER in an amount of 10% of the Bidder's maximum Bid price. CONTRACTOR shall pay wages to each laborer and mechanic at a rate not less than the minimum wages specified in the current wage determination in accordance with the provisions of the Davis Bacon Act. Bidders shall comply with the President's Executive Order No. 11246, Equal Employment Opportunity as amended. The City of Portsmouth reserves the right to reject any or all Bids, to waive any technicality, and to accept any Bid which it deems advantageous. All Bids shall remain subject to acceptance for 60 days after the time set for receiving Bids. Contract award shall be made based on the lowest responsive and responsible Bidder. The Strand Associates, Inc.(R) project manager is Andrew R. Esarey, P.E. and can be contacted at Strand Associates, Inc.(R), 325 West Main Street, Suite 710, Louisville, KY 40202, (502) 583-7020 regarding the Project. For all further requirements regarding Bid submittal, qualifications, procedures, and Contract Award, refer to the Instructions to Bidders that are included in the Bidding Documents.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents