Similar Projects
Main Street Utility Upgrades
Infrastructure
Bidding
Calais, ME

Repair and Replacement of Sewer Line
Post-Bid
Portland, ME 04101

Route 302 Water Main Replacement
Post-Bid
$800,000 est. value
Fryeburg, ME

Supply all Needed Materials and Labor to Install and Hook Up Water Main Pipe on the CMCC Campus
Results
Auburn, ME 04210

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Miscellaneous Valve Repair
Post-Bid
Princeton, ME

25th Avenue Water Main Replacement
Results
Madawaska, ME

2021 Various Water Main Replacements Project
Post-Bid
Bethel, ME

Kennebec River Water Intake
Results
Skowhegan, ME

Waterline Improvements Project
Post-Bid
Bangor, ME 04401

2020 Water Main Replacement
Results
Less than $610,000 est. value
Lewiston, ME

Windham Field Allen SRRF Underground Sprinkler and Domestic Water Service Upgrade
Post-Bid
Windham, ME 04062

State and Hancock Street Utility Improvements
Results
Bangor, ME 04101

Water / Sewer Service Installation at 145 Allagash Drive
Infrastructure
Post-Bid
Brunswick, ME 04011

Benton Avenue Water Main Replacement
Results
Less than $2,000,000 est. value
Winslow, ME 04901

Last Updated 11/05/2021 09:07 AM
Project Title

Nylander Museum Water Damage Repairs

Physical Address View project details and contacts
City, State (County) Caribou, ME 04736   (Aroostook County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractors to do water damage repairs at the Caribou Nylander Museum. The scope of the work will include repairs or replacement of all piping for the sprinkler system above the ceilings. The system must be inspected and tested from a certified sprinkler alarm system company. Insulation in the north gallery shall be installed at a minimum of R38. A new ceiling shall be installed which will match the south gallery and main entrance. Acoustic board which is readily available at local retailers shall be used. All trim for the ceiling shall match the Main and South gallery. The ceiling and trim boards must be painted to match the rest of the building. The hardwood floors shall be sanded to remove the cupping, then stained and sealed.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents