Similar Projects
Calder Casino Industrial Park
New Construction, Infrastructure - 2,300,000 SF
Conception
$700,000,000 est. value
Miami Gardens, FL 33056

Science Laboratory Complex - Modesto Maidique Campus - Florida International University
New Construction, Infrastructure - 124,462 SF
Conception
$93,130,000 CJ est. value
Miami, FL 33194

Northwest 27th Avenue Apartments
New Construction, Infrastructure - 128,803 SF
Design
$37,000,000 CJ est. value
Brownsville, FL 33142

Northwest 27th Avenue Apartments
New Construction, Infrastructure - 128,803 SF
Design
$37,000,000 CJ est. value
Brownsville, FL 33142

NW 116th Way and NW 106th Terrace Roadway and Drainage
Infrastructure
Bidding
$2,000,000 CJ est. value
Medley, FL 33178

NW 116th Way and NW 106th Terrace Roadway and Drainage
Infrastructure
Bidding
$2,000,000 CJ est. value
Medley, FL 33178

Fiber Optic Backbone Expansion Project
Infrastructure
Sub-Bidding
$900,000 CJ est. value
Coral Gables, FL 33134

Road and Bridge Sweeping
Term Contract
Sub-Bidding
$130,000 CJ est. value
Miami, FL 33132

Mechanical Sweeping
Post-Bid
$340,000 est. value
FL

Push Button Intersection Improvements-North
Post-Bid
$1,583,934 est. value
FL

SE 2nd Place and SE 3rd Place from E/SE 6th Avenue to E/SE 7th Avenue and from E/SE 7th Avenue to SE
Results
$1,118,628 est. value
Hialeah, FL 33010

Roadway Improvements to SW 268 Street from SW 139 Avenue to SW 119 Avenue
Results
Less than $9,313,422 est. value
FL

Gateway Commerce Park - Phase 2
New Construction
Construction
Miami Gardens, FL

Bay Harbor Drive Condominiums
Demolition, New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Bay Harbor Islands, FL 33154

Bay Harbor Drive Condominiums
Demolition, New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Bay Harbor Islands, FL 33154

Last Updated 08/05/2022 01:33 PM
Project Title

North Bay Village Baywalk Plaza Area North - Phase 1

Physical Address View project details and contacts
City, State (County) North Bay Village, FL 33141   (Miami-Dade County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $570,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contract specific goals are not placed on Federal/State contracts; however, the Department has an overall 10.65% DBE goal it must achieve The amount of each bid and each bid item, if appropriate, and such other relevant information shall be recorded, and the record and each bid shall be open to public inspection. Late submittals shall not be accepted or considered. Bidder shall submit their bid indicating Bidder's name and Project Name, ITB Number, and time and date of the ITB opening. All bids must be delivered to: NORTH BAY VILLAGE VILLAGE MANAGER/CFO/PURCHASING OFFICE VILLAGE HALL, THIRD FLOOR 1666 Kennedy Causeway, Suite 300 North Bay Village, FL 33141 Failure to comply shall deem submittal as nonresponsive. The Village reserves the right to accept any proposal deemed to be in the best interest of the Village or to waive any informality in any submittal. The Village may reject any or all submittals and readvertise. All questions or comments should be directed to the following email: aatkinson@nbvillage.com. Inquiries must reference "ITB 2022-001 North Bay Village Baywalk Plaza Area North - Phase 1" in the subject line. Deadline to submit written questions is Friday, June 17, 2022 at 4:00 p.m. Pursuant to Section 38.18 of the Village Code, "Ethics Ordinance", a Cone of Silence is hereby imposed whereby any communications between any potential bidder, service provider, lobbyist or consultant and the Village's staff and elected officials pertaining to this RFP are prohibited. The Village reserves the right to delay or modify scheduled dates and will notify Proposers of all changes in scheduled dates.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents