Similar Projects
CRA Project - Phase 3 - Parks, Riverwalk, Trails, Waterfront Boardwalk, and Roadways
Infrastructure
Bidding
Jacksonville, FL

Pecan Park Road and Cole Flyer Road Improvements
Infrastructure
Bidding
Jacksonville, FL 32260

Broward Road Roadway Improvements
Post-Bid
Less than $315,377 est. value
Jacksonville, FL 32099

Gate Parkway Traffic Calming Project
Post-Bid
Jacksonville, FL

I-10 Rest Area Reconstruction
Results

University/Merrill Roundabout Construction
Results
Jacksonville, FL 32203

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

5th and McDuff Roadway Improvements
Results
Less than $2,487,697 est. value
Jacksonville, FL 32203

Countywide Program Management Services for Resurfacing and Sidewalk Construction
Infrastructure
Post-Bid
Jacksonville, FL

San Pablo Right Turn Lane Phase 2 Project
Results
Less than $63,719 est. value
Jacksonville, FL 32202

Traffic Signal Preventive Maintenance
Infrastructure
Post-Bid
Jacksonville, FL

FDOT Pedestrian Improvements - PQ - Horizontal
Results
Less than $480,606 est. value
Jacksonville, FL 32099

Traffic Signal Unit Price Construction Countywide
Infrastructure
Post-Bid
Jacksonville, FL

Five Points Roadway Improvements
Results
Less than $1,431,376 est. value
Jacksonville, FL 32202

Bimt Berth 22 High Heavy Lot Resurfacing
Infrastructure
Post-Bid
Jacksonville, FL

Last Updated 08/10/2021 02:49 PM
Project Title

San Pablo Road South Widening Project

Physical Address View project details and contacts
City, State (County) Jacksonville, FL 32214   (Duval County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Traffic Signalization
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of adding center-turn lanes, right-turn lanes, bike lanes, sidewalks and stormwater collection system in addition to the roadway lighting, signalization, utilities and landscape improvements from Beach Boulevard to Atlantic Boulevard. The project will provide much needed safety improvements and will improve traffic flow through the corridor. LSBE participation goal for 20%

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 26 - Electrical.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents