Similar Projects
Terminal Road And Parking Lot Improvements - City of Kenai
Infrastructure
Conception
$1,750,000 CJ est. value
Kenai, AK 99611

Terminal Road And Parking Lot Improvements - City of Kenai
Infrastructure
Conception
$1,750,000 CJ est. value
Kenai, AK 99611

Lowell Creek Flood Diversion - US Army Corps of Engineers - Alaska District
Infrastructure
Design
$185,225,000 CJ est. value
Seward, AK 99664

Trail River Bridge Wearing Surface Repair
Infrastructure
Design
$1,000,000 CJ est. value
Seward, AK 99664

KRSMA: Funny River Riverbank Protection - Rebid
Infrastructure
Bidding
$250,000 CJ est. value
Soldotna, AK 99669

KRSMA: Funny River Riverbank Protection - Rebid
Infrastructure
Bidding
$250,000 CJ est. value
Soldotna, AK 99669

Achemak Selo School - Kenai Peninsula Borough
New Construction, Infrastructure
Post-Bid
$500,000 CJ est. value
Fritz Creek, AK 99603

Salmon Creek Channel Excavation and Embankment Maintenance
Infrastructure
Post-Bid
$500,000 CJ est. value
Seward, AK 99664

Resurface Old Seward Highway From Dimond Boulevard to Dowling Road
Infrastructure
Results
$2,500,000 to $5,000,000 est. value

M/V Lituya Coatings and Preservation
New Construction, Infrastructure
Results
$2,500,000 to $5,000,000 est. value

Seward Highway Milepost 25.5-36 Rehabilitation Project - Alaska Department of Transportation
Infrastructure
Pending Verification
$50,000,000 CJ est. value
Moose Pass, AK 99631

Seward Highway Milepost 25.5-36 Rehabilitation Project - Alaska Department of Transportation
Infrastructure
Pending Verification
$50,000,000 CJ est. value
Moose Pass, AK 99631

Apron And Willow Street Extension - City Of Kenai
Infrastructure
Conception
$2,350,000 CJ est. value
Kenai, AK 99611

Parkway Avenue Capital Improvement Project
Infrastructure
Bidding
$400,000 CJ est. value
Kenai, AK 99611

Spencer Whistle Stop Road Maintenance - Chugach National Forest
Alteration
Post-Bid
Seward, AK

Last Updated 07/22/2023 07:02 AM
Project Title

CHSRA: Tonsina Creek Bridge Abutment Repair

Physical Address View project details and contacts
City, State (County) Seward, AK 99664   (Kenai Peninsula County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $381,350 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Department invites bidders to submit bids for furnishing all labor, equipment, and materials and performing all work for Tonsina Creek Bridge Abutment Repair, Project No. 71039-1 Engineers Estimate Range: Between $250,000 and $500,000 The apparent successful bidder must furnish a payment bond in the amount of 100% of the contract and a performance bond in the amount of 100% of the contract as security conditioned for the full, complete and faithful performance of the contract. The apparent successful bidder must execute the said contract and bonds within fifteen calendar days, or such further time as may be allowed in writing by the Contracting Officer, after receiving notification of the acceptance of their bid. All work shall be completed in N/A Calendar Days, or by May 15th, 2024 . The Department will identify interim completion dates, if any, in the Special Provisions. If a bidder has a question relating to design features, constructability, quantities, or other technical aspects of the project, it may direct its inquiry to the contact listed below. A bidder requesting assistance in viewing the project site must make arrangements at least 48 hours in advance. The point of contact for inquiries for this project is: Katie Winter, P.E. Project Manager Email: katie.winter@alaska.gov Phone: (907) 269-6410 A bidder may direct questions concerning bidding procedures and requirements to: Rys Miranda, P.E. Chief, Design & Construction 550 W. 7th Ave., Suite 1340 Anchorage AK 99501 E-Mail: rys.miranda@alaska.gov Phone: (907) 269-8736 Install slope revetment measures and repair the existing abutment slope of the Tonsina Creeks north fork bridge. Additive alternative work includes installation of on-grade boardwalk. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents