Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

Whitaker Lane and Rancho Drive Rehabilitation Project
Infrastructure
Bidding
$1,700,000 CJ est. value
Fallon, NV 89406

Whitaker Lane and Rancho Drive Rehabilitation Project
Infrastructure
Bidding
$1,700,000 CJ est. value
Fallon, NV 89406

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

2022-2023 Preventive Maintenance Project
Term Contract
Post-Bid
$900,000 CJ est. value
Fallon, NV 89406

Slurry Seal
Results
$515,000 to $620,000 est. value
NV

Lake - Replace Meters & Backflow Preventers
Infrastructure
Results

Sherman Street and North Broadway Street Rehabilitation Project
Infrastructure
Post-Bid
$3,300,000 CJ est. value
Fallon, NV 89406

2-Inch Overlay with Areas of Roadbed Modification
Infrastructure
Results
$1,850,000 to $2,200,000 est. value
NV

Coldmill and Place Plantmix Bituminous Surface with open Grade and ADA Improvements
Infrastructure
Results
$4,600,000 to $5,500,000 est. value
NV

Crack Sealing on Various Routes
Infrastructure
Results
$1,050,000 to $1,300,000 est. value

Last Updated 08/12/2022 08:02 AM
Project Title

West A Street and Taylor Street Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Fallon, NV 89406   (Churchill County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $1,900,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Work generally includes but is not limited to: Roadway reconstruction of approximately 2,900 linear feet of West A Street and Taylor Street, various concrete improvements, such as, replacement of sidewalk, curb and gutter, residential and commercial driveway or approach improvements, and ADA compliant pedestrian ramps at the affected intersections, storm drain improvements include new catch basins and lateral tie-ins, minor striping, and traffic control. The Work will be substantially completed within 65 calendar days

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents