Similar Projects
Turner Brewer Septic and WPS
Alteration
Design
$25,000 to $100,000 est. value
Roy, WA

Mercer Island and Enatai Interceptor Upgrade-Conveyance Improvements
Infrastructure
Bidding
$52,417,000 est. value
WA

Upper Buckley Water Quality
Infrastructure
Bidding
$6,678,000 est. value
Tacoma, WA 98417

Value Planning Analysis Services - The City of Palouse
Term Contract, Alteration
Post-Bid
Palouse, WA

Allen Road Sanitary Sewer Improvements
Infrastructure
Post-Bid
$225,000 est. value
Roy, WA 98580

Southside Interceptor CIPP Sewer Rehabilitation Phase 2
Infrastructure
Results
$1,662,108 est. value
Vancouver, WA 98687

Exposed Sewer Pipe Repairs - Site 5
Infrastructure
Results
$3,200,000 to $3,700,000 est. value
Bothell, WA 98011

Sewer Main Improvements
Infrastructure
Bidding
$6,000,000 est. value
Everett, WA

Highlands and Northwest Interceptor Sewer Rehabilitation
Infrastructure
Post-Bid
$1,206,033 est. value
Kennewick, WA 99336

Mcmillin Reservoir Onsite Septic System Holding Tank Construction for Comfort Station
Infrastructure
Results
WA 98374

Kelleher Road Property Cleanup
Demolition, Infrastructure
Bidding
WA

Continuous Steel Sewer Rod - Value Blanket
Infrastructure, Alteration
Post-Bid
Spokane, WA

City of Tacoma WW Sewer Replacement South J Street
Infrastructure
Results
$3,000,000 to $3,700,000 est. value
Tacoma, WA 98417

Wastewater Collection System Improvements
Infrastructure
Bidding
Selah, WA

Catch Basin and Drywell Cleaning
Infrastructure, Alteration
Post-Bid
WA

Last Updated 11/19/2021 01:33 PM
Project Title

184th Place SE Sewer Relocation

Physical Address View project details and contacts
City, State (County) Bothell, WA 98012   (Snohomish County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,500,000 to $1,700,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work under this Contract includes: Schedule A: Installation of approximately 1,350 linear feet of 8-inch C-900 PVC sewer main including manholes, steel pipe casing, and sewer lateral connections; removal/abandonment of existing PVC and ductile iron sewer main; installation of water valves; and trench surface restoration. Schedule B: Relocation of approximately 80 linear feet of 8-inch ductile iron water main, connection to existing system, and full-width pavement restoration over the entire project alignment. Sewer installation will require deep excavation (max depth approximately 20 ft below ground surface), crossing of high-pressure gas mains, crossing of a stream culvert, and temporary bypass pumping. The project is located in the Right-of-Way on 184th Place SE and 28th Ave SE. Restoration associated with the project includes, but is not limited to: trench patching; planing bituminous pavement; full-width HMA overlay over existing pavement; channelization; monument re-establishment; and reconstruction of shoulder surfaces, driveway, landscaping and other areas disturbed during construction

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents