Similar Projects
Existing Township Hall Remodel
Renovation
Conception
Saugatuck, MI

Construct New Addition to Transit Administrative Building - City of Battle Creek
Addition, Infrastructure
Conception
$16,400,000 CJ est. value
Battle Creek, MI 49014

14-B District Court & Ypsilanti Township Civic Center
Renovation
Design
Ypsilanti, MI 48197

Ingham County Building Improvements
Renovation
Bidding
$460,000 CJ est. value
Mason, MI 48854

City Hall Refurbishment
Renovation - 15,000 SF
Bidding
$3,000,000 CJ est. value
Roseville, MI 48066

Renovation of the Huron County Circuit Court – Juvenile Division/ Friend of the Court Suite
Renovation
Post-Bid
Bad Axe, MI 48413

Court Bathroom Remodel
Renovation
Post-Bid
Sandusky, MI

City Hall Exterior Restroom Renovation
Renovation
Results
Less than $24,000 est. value
Big Rapids, MI

Design/Build District Court Addition of Office Space
Renovation
Results
Kentwood, MI 49512

Ottawa County Family Justice Center
Renovation
Construction
$200,000 CJ est. value
West Olive, MI 49460

City Hall 1st Floor Renovations - Phase 1
Renovation
Construction
$115,511 CJ est. value
Midland, MI 48640

Civic Center - White Lake Township
New Construction, Infrastructure
Pending Verification
$8,000,000 CJ est. value
White Lake, MI 48386

Renovation - City Clerk Department - FAC036 - City of Novi
Renovation
Conception
$250,000 est. value
Novi, MI

Restrooms Renovations at 19th District Court
Renovation
Bidding
$600,000 CJ est. value
Dearborn, MI 48126

31st District Court Renovation
Renovation
Post-Bid
Hamtramck, MI 48212

Last Updated 09/22/2022 06:09 AM
Project Title

City Hall Outside Brick Masonry Upkeep and Repair - City of Battle Creek

Physical Address View project details and contacts
City, State (County) Battle Creek, MI 49014   (Calhoun County)
Category(s) Government/Public
Sub-Category(s) Capitol/Court House/City Hall
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2025
Bids Due View project details and contacts
Estimated Value $215,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Grind and repoint all mortar joints in the brick masonry to eliminate the smear coating. Remove and replace cracked brick units. As of September 22, 2022, this project is currently in the FY 2023-2028 CIP . Funding fro this project is allotted in the city's capital improvement plan for construction Fy 2024. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents