Similar Projects
Brookview Village - Expansion Phase III
Infrastructure
Design
$500,000 to $1,000,000 est. value
Greenfield Center, NY 12833

Smart AMI Water Meter System
Infrastructure
Bidding
Yorktown, NY

Fire Hydrants
Infrastructure
Bidding
NY

Pipes, Fittings, Hydrants and Valves
Post-Bid
Saratoga Springs, NY 12866

Corliss Pump Station Improvement Project Valve Installations
Post-Bid
Rensselaer, NY 12144

Shared Water Improvements
Results
Less than $115,000 est. value
Champlain, NY

Installation of Cone Valves at East Delaware Tunnel Outlet
Results
$721,650 to $976,350 est. value
Neversink, NY 12765

Fire Hydrant
Infrastructure
Bidding
New York, NY

Lafayette Avenue Rehabilitation
Post-Bid
Geneva, NY 14456

Water District No. 13 Water Main Installation
Results
Clarendon, NY 14429

Ontario, Cooper, Lockport, and Franklin Streets Waterline Replacement
Infrastructure
Bidding
Olcott, NY 14126

Pipe , Culvert, Valves and Fittings
Term Contract
Post-Bid
$50,000 to $500,000 est. value

Water System Improvements - Town of Hamburg and West Seneca, City of Lackawanna
Results
Hamburg, Lackawanna, West Seneca, NY

Cement Lined Ductile Iron Pipe, Flanged
Term Contract
Bidding
NY

Village of Schoharie Intake Line Replacement
Post-Bid
Less than $150,000 est. value
Schoharie, NY 12157

Last Updated 09/09/2021 08:25 AM
Project Title

Carmel Water District 2 - Water Main Lining Project Phase 2

Physical Address View project details and contacts
City, State (County) Carmel, NY   (Putnam County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Carmel Water District No. 2 Water Main Lining Project – Phase 2 consists of cleaning, proofing and cementitious lining of up to 26,000 LF of multiple type (DI & CI) water mains. The Work includes, but is not limited to, the following: provision of temporary water supply; heavy cleaning of existing water mains and disposal of associated waste; proofing and reporting on results of proofing with findings, conclusions and recommendations; cementitious lining of water mains; and all other appurtenant and related Work including demolitions; connections to existing facilities; maintenance and protection of traffic; restoration; paving; environmental protection and coordination with utilities, all as shown, specified or required to complete the Project.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents