Similar Projects
Old Furnace Road Sidewalk Gaps - PWSTP52 - City of Harrisonburg
Infrastructure
Conception
Less than $1,000,000 est. value
Harrisonburg, VA 22801

University Boulevard Relocation - PWSTP43 - City of Harrisonburg
Infrastructure, Alteration
Conception
$8,501,222 est. value
Harrisonburg, VA 22801

Walmart Distribution Center #7045.519 - Pavement Repair Project / Mount Crawford
Infrastructure
Bidding
$1,500,000 CJ est. value
Mount Crawford, VA 22841

RFQ Contractor - Phlipott Landslide Construction
Infrastructure
Post-Bid
$10,000,000 CJ est. value
Bassett, VA 24055

Virginia State University Academic Commons Building Project
Demolition, Renovation, Infrastructure - 174,000 SF
Post-Bid
$100,000,000 CJ est. value
Petersburg, VA 23803

Indefinite Delivery Indefinite Quantity (IDIQ) Paving at Various Locations, Washington DC, MD, & VA
Results
Less than $75,000,000 est. value
Washington, DC

2022 Latex Modified
Infrastructure
Results
$948,000 est. value
VA

Veronesi Holdings Production Center - Innovation Village
New Construction, Infrastructure
Pending Verification
$100,000,000 CJ est. value
Harrisonburg, VA 22802

U.S. Route 33 Self-Storage Facility
New Construction, Infrastructure - 48,900 SF
Pending Verification
$6,000,000 CJ est. value
Penn Laird, VA 22846

Port Republic Road - Bradley Drive Signal - PWSTP49 - City of Harrisonburg
Infrastructure
Conception
$3,242,169 est. value
Harrisonburg, VA 22801

Blue Heron Landing Park
Infrastructure
Post-Bid
$775,000 CJ est. value
Chesapeake, VA 23464

2022 Surface Treatment
Infrastructure
Results
$4,361,000 est. value

Secure Store Rockingham Park Way Self-Storage
New Construction, Infrastructure - 88,000 SF
Pending Verification
$10,000,000 CJ est. value
Penn Laird, VA 22832

University Boulevard And Evelyn Byrd - Sidewalk - PWSTP14 - City of Harrisonburg
Infrastructure
Conception
$1,969,000 est. value
Harrisonburg, VA 22801

North Main Street Pedestrian Improvements
Infrastructure
Post-Bid
$430,000 est. value
Bridgewater, VA 22812

Last Updated 04/28/2023 05:31 PM
Project Title

Gen Oak Connector

Physical Address View project details and contacts
City, State (County) Bridgewater, VA 22812   (Rockingham County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Town of Bridgewater is accepting bids for the Gen Oak Connector, which is the construction of a shared-use path and sidewalk between Generations Park and Oakdale Park in the Town of Bridgewater. The Gen-Oak Connector is the construction of a shared-use path and sidewalk between Generations Park and Oakdale Park in the Town of Bridgewater. Gen-Oak consists of a new sidewalk starting at Generations Park along North Liberty Street continuing to a new crosswalk at the intersection of Mt. Crawford Avenue and North Liberty Street, a new sidewalk east along Mt. Crawford Avenue and connecting to a new shared-use path through and terminating in Oakdale Park. Gen-Oak also installs a crosswalk near the entrance of Oakdale Park at the intersection of Mt. Crawford Avenue and Naomi Lane. The total length of the Gen-Oak Connector is approximately 1,100 feet. Bids shall be accompanied by a 5% bid security. Bid bond must be in the form of a cashier's check, certified check, or a bid bond issued by a surety.Bid security in the amount stated in the Invitation to Bid must accompany each bid. The successful bidder's security will not be returned until he has signed the Contract and has furnished the required Certificates of Insurance. The Owner reserves the right to retain the security of all bidders until the successful bidder enters into the Contract or until 90 days after bid opening, whichever is sooner. If any bidder refuses to enter into a Contract, the bid security may be forfeited. Prior to signing the Contract, the Owner will require the successful bidder to secure and post a Labor and Materials Payment Bond and a Performance Bond, each in the amount of 100% of the Contract Sum. Such Bonds shall be issued by a Surety acceptable to the Owner Questions about the project will be received until February 20, 2022 at 5:00 p.m.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents