Similar Projects
Nacero Gasoline Manufacturing Development / Odessa
New Construction, Infrastructure
Design
$7,000,000,000 CJ est. value
Penwell, TX 79766

Prosperity Bank - Odessa
New Construction, Infrastructure - 13,568 SF
Design
$4,000,000 CJ est. value
Odessa, TX 79761

Highway Improvement - BI 20-E
Infrastructure
Bidding
$1,868,155 CJ est. value
Odessa, TX 79765

Highway Improvement - BI 20-E
Infrastructure
Bidding
$1,868,155 CJ est. value
Odessa, TX 79765

Lithia Hyundai of Odessa
Infrastructure, Build-out
Post-Bid
$2,500,000 CJ est. value
Odessa, TX 79762

2022 Street Repair of Chihuahua Street and River Road. Intersection, and Preservation of Lauren Court, Hillcrest Drive, and Kyle Street
Infrastructure
Post-Bid
$700,000 est. value
La Vernia, TX

Plant Farm Ponds Rehabilitation
Infrastructure
Results
$5,276,092 CJ est. value
Midland, TX 79701

SH 302 - Safety Improvement Projects
Infrastructure
Results
$2,490,485 est. value
TX

Midland Store / Hops, Scotch and Vinery
New Construction, Infrastructure - 3,607 SF
Construction
$750,000 CJ est. value
Midland, TX 79701

Downtown Community Center / Odessa College
New Construction, Infrastructure - 1,611 SF
Construction
$3,000,000 CJ est. value
Odessa, TX 79761

Midland Children's Rehabilitation Center Aquatic Therapy Center
New Construction, Infrastructure
Pending Verification
$2,240,000 est. value
Midland, TX

Odessa Country Club / Indoor Tennis Center
New Construction, Infrastructure - 17,300 SF
Pending Verification
$2,500,000 CJ est. value
Odessa, TX 79765

JM Test Building #5 Phase 2
Infrastructure, Build-out - 1,400 SF
Design
$250,000 CJ est. value
Odessa, TX 79761

Highway Improvement - FM 1882
Infrastructure
Bidding
$11,667,891 CJ est. value
Odessa, TX 79765

Murphy Express #8640 - Odessa
New Construction, Infrastructure
Post-Bid
Odessa, TX 79762

Last Updated 08/24/2023 10:57 AM
Project Title

2023 Bond Proposition B - Ector Independent School District

Physical Address View project details and contacts
City, State (County) Odessa, TX 79761   (Ector County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Athletic Facility, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $8,096,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Ratliff Stadium: concrete overlay of bleachers; update restrooms; LED lighting for stadium parking lot; LED lighting at track/field event venue; air conditioning/heating for south building locker rooms; replace one grass field with artificial turf; (also includes any major maintenance needs at the stadium complex identified in Facilities Assessment report). This project is part of the Ector Independent School District's Bond Election scheduled for November 7, 2023. Early Voting will be held October 23-27, and October 30-November 3. Further details regarding design and construction timelines have not been identified.

Details

Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings.
Division 09 - Finishes, Painting.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 31 - Earthwork, Site Clearing, Earth Moving.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Athletic and Recreational Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents