Similar Projects
PS1 24" Forcemain - Construction - 22A01 - North Shore Water Reclamation District
Infrastructure
Conception
$5,368,000 CJ est. value
Gurnee, IL 60031

North Highway 45 Warehouse Distribution Building 2
New Construction, Infrastructure - 168,980 SF
Conception
$20,000,000 CJ est. value
Libertyville, IL 60048

Blackburn Street Multi-Residential Renovation
Addition, Demolition, Infrastructure
Design
$600,000 CJ est. value
Gurnee, IL 60031

Asphalt Sealcoating and Repairs at Raw Water Pump Station, Elevated Tank and Booster Pump Station Facilities
Infrastructure
Design
$200,000 CJ est. value
Lake Bluff, IL 60044

FY23 CONCRETE REPAIRS AT THE WAUKEGAN WATER RECLAMATION FACILITY
Infrastructure, Renovation
Bidding
$500,000 CJ est. value
Waukegan, IL 60085

S4 Interceptor Sewer Improvements
Infrastructure
Bidding
$200,000 CJ est. value
Beach Park, IL 60099

Community Park Paving Improvements
Alteration
Post-Bid
Mundelein, IL 60060

Soil Preparation at Grant Woods Forest Preserve
Infrastructure
Post-Bid
Ingleside, IL 60041

Salt Barn Improvements - Sitework Package
Alteration
Results
Antioch, IL

Advanced Technology Center Excavation
Infrastructure
Results
Grayslake, IL

Tonality Microbrewery
Renovation - 7,200 SF
Construction
$1,000,000 est. value
Mundelein, IL 60060

The Clove
New Construction, Infrastructure - 113,000 SF
Construction
$150,000,000 CJ est. value
Buffalo Grove, IL 60089

Antylia Scientific New Headquarters
New Construction, Addition - 120,000 SF
Pending Verification
Vernon Hills, IL 60061

Peterson Road Mixed Use
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Libertyville, IL 60048

North Highway 45 Warehouse Distribution Building 1
New Construction, Infrastructure - 165,150 SF
Conception
$20,000,000 CJ est. value
Libertyville, IL 60048

Last Updated 10/24/2022 10:10 AM
Project Title

Eagle Family Foods

Physical Address View project details and contacts
City, State (County) Waukegan, IL 60087   (Lake County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Site Development
Contracting Method Bids by Invitation
Project Status Sub-Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for exterior site improvements and interior renovations within the existing building. Level 3 interior alteration to 4 conjoined spaces. Please direct all bids/inquiries to the general contractor.

Details

1 Story Above Grade, 86,600 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents