Similar Projects
Botanic Miramar Beach - Mixed Use
New Construction - 25,753 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Miramar Beach, FL

The Cascade at Sandestin
New Construction
Conception
Miramar Beach, FL

Bella Rosa Apartments
New Construction
Design
Santa Rosa Beach, FL

The Grove at Seascape Resort
New Construction - 10,000 SF
Design
Miramar Beach, FL 32550

Sandestin Owners Association Administration Complex
New Construction, Infrastructure
Bidding
$8,000,000 CJ est. value
Miramar Beach, FL 32550

Bridge Repair/Rehabilitation BDI
Infrastructure
Bidding
$135,619 CJ est. value
Freeport, FL 32439

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Water, Sewer And Roadway At Woodlawn Commerce Park
Infrastructure
Post-Bid
Defuniak Springs, FL

Douglass Crossroads/Knox Hill Road Improvements
Results
DeFuniak Springs, FL 32435

Eve Circle Roadway & Drainage Improvements
Results
$958,151 est. value
De Funiak Springs, FL 32433

Madison at Owl's Head Farm
New Construction
Construction
Freeport, FL

The Primrose
New Construction
Construction
Santa Rosa Beach, FL

Wildwood Village
New Construction
Pending Verification
Inlet Beach, FL 32413

Bishop Landing
New Construction
Pending Verification
$79,800,000 est. value
Santa Rosa Beach, FL 32459

The Southern Phase 2
New Construction
Conception
$40,700,000 est. value
Santa Rosa Beach, FL 32459

Last Updated 08/08/2022 02:33 PM
Project Title

The Preserve at Point Washington

Physical Address View project details and contacts
City, State (County) Santa Rosa Beach, FL 32459   (Walton County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Paving/Reconstruction, Single-Family Homes, Site Development
Contracting Method Bids by Invitation
Project Status Obtained from a credible source, Awaiting verification, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $6,900,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope includes the new construction of 6 duplex buildings on 6.66 acres, 0.5 mile from the intersection. Scope details have not been released. As of August 8, 2022 the project is in planning stage and seeking development approval from the Walton County Technical Review Committee. A meeting was held July 6, 2022, but the results are not yet available. Information regarding the developer, architect, general contractor and method of selection has not been disclosed. The construction timeline has not been determined, but is not expected to begin before the first quarter of 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

2 Stories Above Grade, Apartments, 6 Unit(s). 2 Stories Above Grade, Apartments, 6 Unit(s).
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Storm Drainage Structures, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents