Similar Projects
Venture Academy High School Improvements
Renovation
Conception
Minneapolis, MN 55414

Venture Academy Middle School
Build-Out
Conception
Minneapolis, MN

The Emi - Mixed Use
New Construction - 53,584 SF
Design
$10,000,000 CJ est. value
Richfield, MN 55423

Bhatti GI Surgery Center
Demolition, New Construction, Infrastructure - 40,032 SF
Design
$15,000,000 CJ est. value
Minneapolis, MN 55435

Minnetonka High School RTU Replacement
Renovation
Bidding
$200,000 CJ est. value
Minnetonka, MN 55345

Satori Boutique Apartments
New Construction - 1,161 SF
Post-Bid
$34,800,000 est. value
Minneapolis, MN 55411

Wellstone Health Office Room 214
New Construction
Post-Bid
Minneapolis, MN 55403

Momentum Addition to Pagel Activity Center
Addition - 10,000 SF
Results
Minnetonka, MN 55345

Bethune Arts Magnet Renovations and Performance Addition Project
Renovation, Addition
Results
Minneapolis, MN 55411

Texas-Tonka Apartments
New Construction - 105,767 SF
Construction
$25,000,000 est. value
Minneapolis, Saint Louis Park, MN 55426

Central Education Center
Renovation
Construction
Richfield, MN 55423

Nicollet Avenue Apartments
New Construction
Pending Verification
Minneapolis, MN 55408

Wayzata Boulevard East Mixed Use Development
New Construction, Infrastructure - 39,500 SF
Pending Verification
$38,900,000 CJ est. value
Wayzata, MN 55391

Glen Lake Apartments
New Construction - 19,081 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Minnetonka, MN 55345

Best Value Contractor for the North High School Renovations
Renovation
Post-Bid
Minneapolis, MN 55411

Last Updated 09/09/2022 12:07 PM
Project Title

Bloomington Schools - Oak Grove Middle School Maintenance Garage Floor Remediation

Physical Address View project details and contacts
City, State (County) Bloomington, MN 55431   (Hennepin County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Middle/Senior High School, Parking Garage
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $117,148 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of 07/28/2022 No start and end date. Remove existing tunnel hatch cover and ladder. Replace deteriorated concrete floor. Install traffic coating on floor and return up vertical. Remove existing concrete block wall, Relocate existing light switch. Relocate existing pneumatic thermostat. Site Directions: 130 West 106th Street, Bloomington, MN

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents