Similar Projects
On Call Plumbing Services for Projects
Post-Bid
$10,000 to $50,000 est. value
Shrewsbury, MA

Amherst Campus - Water Softener Installation and Service
Post-Bid
Shrewsbury, MA

Millbury Public Schools Field Amenities Building - Filed Sub-Bids
Results
Less than $565,000 est. value
Millbury, MA

On-Call Plumbing Services
Term Contract
Results
Less than $10,000 est. value
Jefferson, MA 01522

Asbestos Abatement on the Second Floor of the West Boylston Fire Station- Sub-Bid
Post-Bid
$45,000 to $65,000 est. value
West Boylston, MA 01583

Blackstone Valley Technical High School Biotech/Chemistry Lab Renovation - Filed Sub-Bids
Results
Less than $825,000 est. value
Upton, MA

Plumbing Supplies/City
Alteration
Post-Bid
Worcester, MA

200-1 Site Drainage / Basement Flooding Mitigation - Filed Sub-Bids
Results
Less than $2,400,000 est. value
Fitchburg, MA 01420

On-Call Plumbing Services
Term Contract
Post-Bid
$50,000 est. value
Worcester, MA

Boiler Replacement Northbridge Middle School - Filed Sub Bids
Results
Less than $2,395,065 est. value
Northbridge, Whitinsville, MA 01588

Plumbing, Heating, and Mechanical Services
Term Contract, Alteration
Post-Bid
$130,000 est. value
Westborough, MA

On-Call Plumbing Services Contract
Results
$45,480 est. value
Oxford, MA

Plumbing
Alteration
Post-Bid
Warren, MA

Water Heater Replacement - North High School/WPS
Alteration
Results
$350,000 est. value
Worcester, MA 01604

On-Call Plumbing Services
Alteration
Post-Bid
Less than $50,000 est. value
Fitchburg, MA

Last Updated 10/08/2021 02:35 PM
Project Title

Plumbing Waste Collection Tree Replacements

Physical Address View project details and contacts
City, State (County) Athol, MA 01331   (Worcester County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $47,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Scope of the project includes Remove and replace selected Cast Iron waste collection , but is not limited to: points with ABS and install new 4" ABS Clean-Outs into existing 4" cast.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents