Similar Projects
New Model Laboratory School
New Construction
Conception
$90,000,000 est. value
Richmond, KY 40475

Giles Gallery Update
Renovation
Bidding
$140,000 est. value
Richmond, KY 40475

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Schwendeman Server Room HVAC Upgrades
Results
Less than $132,000 est. value
Richmond, KY 40475

Keen Johnson Building - Lower Level
Renovation
Results
Less than $1,500,000 est. value
Richmond, KY 40475

Clay Hall Front Entrance Resurfacing
New Construction
Post-Bid
Richmond, KY 40475

Combs Building
Renovation
Results
$275,000 est. value
Richmond, KY 40475

Campbell Building Heat Exchanger Replacement
Alteration
Post-Bid
Richmond, KY 40475

Stone Building Ventilation Upgrades
Alteration
Results
$310,341 est. value
Richmond, KY 40475

Split System and Rooftop A/C Replacement
Alteration
Post-Bid
Louisville, KY 40212

Schwendeman-Thompson HVAC and Building Upgrades
Alteration
Results
$1,380,000 est. value
Richmond, KY 40475

Berea College CMIT
New Construction - 48,761 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
Berea, KY 40403

Schwendeman-Thompson HVAC and Building Upgrades
Renovation, Alteration
Results
$1,380,000 est. value
Richmond, KY 40475

Campbell and Combs Exterior Soffit Replacement
Alteration
Results
Richmond, KY 40475

Reported 05/17/2022 03:54 PM
Project Title

Arlington HVAC Replacement

Physical Address View project details and contacts
City, State (County) Richmond, KY 40475   (Madison County)
Category(s) Education, Entertainment/Recreation, Single Trades
Sub-Category(s) Clubhouse/Social Club, College/University, HVAC
Contracting Method
Project Status Abandoned
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This purpose of this project is to provide the design and installation of a new HVAC system to the University Club at Arlington golf course pro shop/grill building. All existing HVAC systems and related components that are unusable are to be removed and disposed of properly. The bidders are to provide demolition of old system, and repairs to walls and ceilings where old system currently resides. The design of new system will be based on the attached heat load calculations provided unless the designer/installer determine that there is a better methodology after consultation and approval by the owner. The design should provide equipment locations, equipment efficiency ratings, duct work sizes and locations, chase construction details and locations. It is requested that all duct work be rigid when feasible and all duct work be externally insulated. The supply duct will be ceiling distributed and the return air will be positioned on the lower walls. The condensing units will be located under the deck surfaces and the air handlers will be located in the basement area. No roof top units will be allowed. The existing make up air system is to be evaluated and a recommendation shall be given to the University by the bidder noting whether the system is adequate and in proper working order and in good condition or if it should be replaced. Filter sizes will need to be readily available in the marketplace. Installation is to be included in the bid and warranty information approved by the owner. Installation will include any work and/or materials (drywall, matching paint, finishes, etc.) for an acceptable aesthetic appearance once complete.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents