Similar Projects
DISD - MLK Arts Academy - Phase IIi
Renovation - 60,000 SF
Conception
$4,000,000 est. value
Dallas, TX 75215

Hamilton Park Pacesetter Magnet School
Renovation
Conception
$10,000,000 est. value
Dallas, TX 75243

Kipp Oak Cliff Academy Gymnasium
New Construction - 21,000 SF
Design
$6,000,000 est. value
Dallas, TX 75241

IL Texas Garland High School MCJROTC
New Construction
Design
$3,500,000 est. value
Garland, TX 75044

Carrollton Classical Academy Roof Replacement
Renovation - 61,570 SF
Bidding
$9,250,000 est. value
Carrollton, TX 75006

Woodrow Wilson High School - Renovation - CSP Package Part 2
Renovation
Bidding
$300,000 est. value
Dallas, TX 75214

West Dallas STEM School Renovation Phase 1
Renovation
Post-Bid
Dallas, TX 75212

Jefferson High School and Walnut Hill PK-8 Campuses Package 3
New Construction
Post-Bid
Dallas, TX

Construction Management at Risk - Multiple Projects Package 2019-2
Addition
Results
Mesquite, TX 75150

CMAR 2019 Bond Program Phase 1 Projects
Results
Less than $144,213,000 est. value
Mesquite, TX 75150

Jesuit High School Addition
Addition
Construction
Dallas, TX 75244

MISD Choice High School
Construction
Mesquite, TX 75150

Newman Smith High School
Renovation - 75,000 SF
Pending Verification
$22,900,000 est. value
Carrollton, TX 75006

JJ Pearce High School Phase 3
Renovation
Pending Verification
Richardson, TX 75081

Judge Louis A Bedford Jr. Law Academy Temporary Swing Space
Addition - 7,770 SF
Design
$500,000 est. value
Dallas, TX 75232

Reported 06/23/2022 12:00 AM
Project Title

Yvonne a. Ewell Town View Center Renovation - Part 2

Physical Address View project details and contacts
City, State (County) Dallas, TX 75203   (Dallas County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $7,350,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of the following: Removal and replacement of roofing materials, including perimeter flashing and parapet coping. Replacement of existing roof drains and installation of overflow drains and piping from the drain to the exterior wall. Replacement of mechanical curbs and removal of abandoned mechanical equipment. Installation of new lightning protection system, roof located water hydrants and electrical power receptacles.

Details

Middle/Senior High School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents