Similar Projects
Bay County Sheriff's Office Parking Lot Resurfacing
Infrastructure
Results
$210,750 est. value
FL

Mexico Beach Parking Repairs
Results
$87,999 est. value
Mexico Beach, FL 32410

Boat Race Road Multi-Use Path Construction
Infrastructure
Post-Bid
Callaway, FL 32404

CEMIRT Construct New Parking Lot F/ Heavy Vehicles
Post-Bid
Panama City, FL 32403

PCB Parkway Sidewalk (North Pier Park Drive to Nautilus Street
Post-Bid
Panama City Beach, FL 32413

Harrison Avenue Reconstruction Segment 1
Results
Panama City, FL 32461

Magnolia Beach Road Multiuse Path
Results
$348,000 est. value
Panama City, FL 32408

Restore CEMIRT Parking Area
Alteration
Post-Bid
$1,000,000 to $5,000,000 est. value
Panama City, FL 32403

Construct Park and Ride Area
Term Contract
Design
$1,000,000 to $5,000,000 est. value
Tyndall AFB, FL

Bay Parkway Phase 2
Results
Panama City, FL 32413

Safety Project/Traffic Signals/Roadway Signing
Results
Less than $812,740 est. value
FL

CR30 Front Beach Road Sidewalk Construction Project Phase I
Results
Panama City, FL 32401

Sidewalk/Drainage Improvements/Turnout Construction and Base Work (BDI)
Results
Less than $961,137 est. value
FL

Sidewalk Repairs
Results
$314,927 est. value
Mexico Beach, FL 32410

Wallace Road Sidewalk Construction Project
Results
Callaway, FL 32404

Last Updated 10/25/2021 03:56 PM
Project Title

CR30 Front Beach Road Sidewalk Construction Project Phase I and II

Physical Address View project details and contacts
City, State (County) FL   (Bay County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,680,320
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor to provide all necessary labor, supervision, equipment, and supplies to construct concrete sidewalk along the north side of CR30 Front Beach Road, Phases I and II. Phase I begins at Twin Lakes Drive and continues for approximately 1.2 miles to the east where the new sidewalk connects to existing sidewalk at East Lakeshore Drive/Front Beach Rd. Phase II begins at Twin Lakes Drive, connecting to Phase I sidewalk, and continues west for approximately 1.1 miles to Kelly Street. The project also includes minor drainage improvements, some driveways and intersecting roadways reconstruction to meet ADA standards, traffic control and signal work.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents