Similar Projects
Commercial Washers and Dryers for Athletics Department
Term Contract
Bidding
Wilmington, NC

Furnish, Deliver, and Install Bladder Expansion Tanks
Alteration
Bidding
Raleigh, NC 27607

Backhoe
Post-Bid
Rocky Mount, NC

Two Electric Forklifts
Post-Bid
Greenville, NC 27834

Fabric Structures with Related Materials and Services
Results

Fabric Structures with Related Materials and Services
Results

Mohr Plaza Coin-Operated Laundry Equipment
Alteration
Bidding
Lumberton, NC 28358

Landfill Equipment Maintenance and Repair Services
Post-Bid
Wilmington, NC 28401

Ranges Gas and Electric
Results
Robersonville, NC 27871

Furnish, Deliver and Install Commercial Washer/Extractor and Dryer
Post-Bid
Dobson, NC

Lift Inspection and Repair
Term Contract
Results
Raleigh, NC 27610

Minuteman Rush 500 Extractor
Post-Bid
Greensboro, NC 27402

Crane Repair at Building #6, USCG Base Elizabeth City, NC
Results
Elizabeth City, NC 27909

Walk-in Freezer for Senior Center
Post-Bid
Havelock, NC 28532

Charlotte Couplings
Results
$2,763 est. value
Greensboro, NC

Reported 08/11/2021 12:00 AM
Project Title

Paint Spray Booth Repair and Upgrade

Physical Address View project details and contacts
City, State (County) Weeksville, NC   (Pasquotank County)
Category(s) Single Trades
Sub-Category(s) Equipment
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Bring existing paint spray booth up to most current NFPA 33 (see note at bottom of Technical Objectives) and OSHA standards for operation. This includes, but not limited to: - Intake and exhaust systems/plenums shall be appropriately sized and employ fan systems sufficient to ensure maximum performance and fan life. - Ensure internal lighting is compliant with all applicable safety and facility standards. Lighting should be designed to provide appropriate illumination for spray painting operations and provide maximum efficiency regarding power consumption. - Filter system must be designed for chromate removal. Filter system must be triple-stage aerospace for use with aerospace coatings. Filters must meet or exceed Environmental Protection Agency (EPA) Method 319 requirements. Contractor shall provide EPA Method 319 Test Summaries and must demonstrate efficiencies for: Liquid Challenge, Solid Challenge and Pressure Drop (in inches of water) for each stage of filtration (from 50 fpm to 200 fpm, in 50 fpm increments). - Filtration system must meet a demonstrated paint arrestance efficiency of 99.97% or better for chromate-containing coatings. The Base Elizabeth City Synthetic Minor Air Permit limit for bioavailable chromium pigment (hexavalent chromium used in aircraft primer) emission is 0.0056 lb/year. Contractor shall provide Paint Arrestance filter test summaries and associated laboratory test results for chromate-containing aircraft coatings (aircraft primers typically contain 25% - 40% strontium chromate) demonstrating average removal efficiency for the filtration system. In addition, summaries and test results shall demonstrate paintholding capacity, initial pressure drop (in inches of water) and final pressure drop (in inches of water) for the total and each stage of filtration. Information on the paint used, paint spray method, spray feed rate and air velocity shall be included. - Paint booth environment will be auto-balancing capable to compensate for loading of the filter system. - Ensure operators are fully trained in the use of the upgraded spray booth to include normal operating conditions, user-based troubleshooting and user-based maintenance. - Provide a verifiable, industry based, test plan that will confirm achievement of the above objectives. - Comply with the Corrosion Control Configuration Assessment Checklist dated February 26, 2020, Attachment 1. - Through use of Industrial Hygienist services, determine if Hexavalent Chromium dust is present in any of the removed/replaced components and provide this information to the Government.

Details

Division 41 - Material Processing and Handling Equipment, Finishing Equipment, Coating Equipment, Spray Painting Booth.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents