Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

I-285/I-20 West Interchange Project
Design
Atlanta, GA 31175

Fire Station 5 Construction
New Construction, Infrastructure - 10,912 SF
Design
$3,000,000 CJ est. value
Sandy Springs, GA 30328

SR 400 Express Lanes
Post-Bid
Less than $13,000,000 est. value

Creek Walk Connector Trail
New Construction
Post-Bid
GA 30324

Replacement and Installation of Fire Hydrants Standby-Miscellaneous Construction
Results
Less than $100,000 est. value
GA 30303

T32-D7-Pavepres-SR 139 6-9-111011
Results
GA

Rooms To Go Drive Addition
Alteration
Construction
$180,000 est. value
Atlanta, GA 30305

Rooms To Go Drive Addition
Alteration
Construction
$180,000 est. value
Atlanta, GA 30305

Hotel at Southern Post / Roswell
Demolition, New Construction, Infrastructure - 153,137 SF
Pending Verification
$20,000,000 CJ est. value
Roswell, GA 30075

Hotel at Southern Post / Roswell
Demolition, New Construction, Infrastructure - 153,137 SF
Pending Verification
$20,000,000 CJ est. value
Roswell, GA 30075

RFP Design - Construction Professional (CP) Services for Atlanta Unbound Academy, Construction of New K-8 School
New Construction, Infrastructure
Conception
$3,000,000 CJ est. value
College Park, GA 30337

Maintenance Agreement for Permeable Pavers
Post-Bid
Atlanta, GA

Peachtree Dunwoody at Telford Place Roadway Improvement Project
Results
Sandy Springs, GA 30328

Last Updated 08/09/2022 04:32 PM
Project Title

155 Stewart Drive Drainage Maintenance and Improvement Project

Physical Address View project details and contacts
City, State (County) Atlanta, GA 30342   (Fulton County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $244,789 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

155 Stewart Drive Drainage Maintenance and Improvement Project QUESTIONS DUE June 22, 2022, 5:00 P.M All communications regarding this solicitation must be with the assigned Procurement Agent, Edward S McAdoo III, purchasing@sandyspringsga.gov. Questions received after this date and time may not be answered. Questions and clarifications will be answered in the form of an addendum.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents