Similar Projects
Minong - Solon Springs Const / Concrete / Joint Repair
Infrastructure
Design
$2,000,000 CJ est. value
Trego, WI 54888

Minong - Solon Springs Const / Concrete / Joint Repair
Infrastructure
Design
$2,000,000 CJ est. value
Trego, WI 54888

Paving Work on 26th Avenue (Swamp Road)
Infrastructure
Post-Bid
$80,000 est. value

Excavation and Grading of Kilkare Road
Infrastructure
Post-Bid
$100,000 est. value
Spooner, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Spooner - Stone Lake, Crystal Brook Bridge, B-65-0060; Spooner - Stone Lake, USH 53 to South Junction CTH M
Infrastructure
Results
Spooner, WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Minong Ranger Station Replacement - GPC
New Construction, Infrastructure
Pending Verification
$2,927,800 CJ est. value
Minong, WI 54859

New Auburn - Spooner Construction / Pavement Replacement
Infrastructure
Design
$25,000,000 CJ est. value
Trego, WI 54888

Washburn County E-Building Project
New Construction, Infrastructure - 4,000 SF
Post-Bid
$250,000 CJ est. value
Spooner, WI 54801

Spooner - Hayward, Greenwood Avenue to Poplar Street; Spooner - Hayward, Greenwood Avenue to Poplar Street
Infrastructure
Results
WI

Spooner Senior Center Project
Renovation, Infrastructure
Post-Bid
$3,500,000 CJ est. value
Spooner, WI 54801

Crack Seal, Micro-Surfacing, Slurry Leveling, and Pavement Marking
Infrastructure
Results
Burlington, Clintonville, Eagle River, Monroe, Osceola, Shell Lake, Sturgeon Bay, Waukesha, Waupaca, Wisconsin Rapids, WI

Minong Campground Expansion
Infrastructure
Results
$428,487 CJ est. value
Minong, WI 54859

Last Updated 01/20/2023 08:04 AM
Project Title

Spooner - Stone Lake, Yellow River Bridge

Physical Address View project details and contacts
City, State (County) Spooner, WI 54801   (Washburn County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $1,133,294 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Spooner - Stone Lake, Yellow River Bridge, B-65-54; Washburn County; 8130-00-71; STH 70; 0.038 Miles; Excavation, Base, Asphaltic Surface, Beam Guard, Pavement Marking, and Bridge Replacement. Estimate Range - $750,000 - $999,999 Unless otherwise specified in this advertisement, the Department will issue bidding proposals only to those who have established their qualifications for the work to be bid upon. Any prospective bidder who has not established their qualifications must file a sworn statement with the Department not less than TEN business days prior to the time set for submitting bidding proposals on a form furnished by the Department. The Department will evaluate this statement and will issue bidding proposals as it deems warranted. To request an exception to this requirement, contact the Chief Proposal Management Engineer at (608) 266-3721 With each sealed proposal, the bidder must include a properly executed bid bond or a cashiers check, certified check, bank check, or postal money order in the amount designated on the Highway Work Proposal made payable to the Department. Certified checks shall be drawn on the account of the bidder submitting the proposal. The bidder may also satisfy the proposal guaranty requirements by having a properly executed annual bid bond on file with the Department. WisDOT - 38 - Spooner - Stone Lake, Yellow River Bridge *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents