Similar Projects
Replacement of the Sewage Pump Station
Results
Tinton Falls, NJ 07724

Pump Station Maintenance Force Account 2021-2024
Term Contract
Post-Bid
Eatontown, NJ

Sediment Removal Manasquan Reservoir Water Supply System Intake Pump Station
Renovation
Results
Allenwood, NJ 08720

Shrewsbury Avenue Pump Station Upgrades
Infrastructure
Bidding
Tinton Falls, NJ 07724

Rutgers Drive and Nutmeg Court Pump Station Upgrades
Results
$415,000 est. value
Tinton Falls, NJ 07724

Repair of a 600HP Motor Manasquan River Intake Pump Station Manasquan Water Supply System
Results
Wall, NJ 07727

WWTP Sludge Handling System and Emergency Pump Station Improvements
Renovation, Addition
Bidding
Long Branch, NJ 07740

Refurbishing of a Single Stage Vertical Pump, Intake Pump Station, Manasquan Water Supply System
Results
Wall, NJ 07727

Furnish Annual Inspections, Maintenance and Repairs for Duplex Sewage Lift Stations at Various Monmouth County Locations
Term Contract
Results
$31,875 est. value
Freehold, NJ

Maintenance Pump Station Repair Contract, Statewide - 2021
Results
Less than $5,000,000 est. value

Pump Station No. 12 Infrastructure Upgrade
Results
$800,000 est. value
Little Silver, NJ 07739

Upper Manasquan Pump Station Raw Sewage Pump Rebuilding
Results
Howell, NJ

Harbor Road Wastewater Pump Station Project
Results
Marlboro, NJ 07746

Furnish and Deliver Pump Station/Meter Chamber Control Panels
Results
Belmar, NJ 07719

Pleasure Bay Crossing and Main Pump Station Replacement
Post-Bid
Monmouth Beach, NJ 07750

Last Updated 07/01/2021 01:45 PM
Project Title

Fairway Mews Waste Water Pump Station Replacement

Physical Address View project details and contacts
City, State (County) Spring Lake, NJ   (Monmouth County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project shall consist of replacing the existing below grade wastewater pumping station in the Fairway Mews community of the Borough of Spring Lake Heights, Monmouth County, New Jersey.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents