Similar Projects
Last Updated | 05/22/2023 04:03 PM |
Project Title | Parking Ramp 76 Repairs |
Physical Address | View project details and contacts |
City, State (County) | Madison, WI 53705 (Dane County) |
Category(s) | Single Trades |
Sub-Category(s) | Concrete |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | $196,354 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | In general, the work consists of: Double tee joint and shear/ diaphragm (connector) repairs throughout the facility 39 estimated at 2,600 linear feet of joint replacement and approximate 100-150 shear connectors requiring, inspection, 40 welding and/ or replacement. Expansion joint/ EM Seal repairs throughout the facility estimated at 325 linear feet of 41 joint replacement. Repair South-East shear wall spalling and cracking on 3rd floor. Replacement of approximately 42 12,200 square feet of driveway membrane, primarily on level 4, and to a lesser extent on levels 2 and 3. This 43 membrane shall be replaced through a multi-phased process. Repair 300 linear feet of Full Depth cracks in flanges 44 and webs of double tees, primarily on the South side of Level 4. It also includes new guard rails on level 4 of the 45 ramp. Please note that any striping required will be done by the Owner. Bidders shall bring inadequacies, omissions or conflicts to the Architect/Engineer's attention at least 52 ten (10) days before the date set for bid opening Question Deadline 04/08/2023 |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |