Similar Projects
Kings Mountain Equestrian Campground Test Well
Bidding
$10,000 to $20,000 est. value
Blacksburg, SC

Town Of Carlisle Pump Stations Upgrades
Infrastructure
Bidding
$1,000,000 est. value
Carlisle, SC

Provide and Install Two New Fiberglass Sewer Tanks and Grinding Pumps at Charleston County K-9 Facility
Post-Bid
North Charleston, SC 29405

New Well No. 4 and Raw Water Main for Water Plant No. 5
Post-Bid
Sumter, SC 29150

Irrigation Well/Pump Repair/Replacement
Results
Florence, SC

Mable T. Willis Boulevard Well
Results
Walterboro, SC 29488

Well & Pump Installation
Infrastructure
Bidding
Clemson, SC

Schwartz Wastewater Treatment Plant Philly RAS Pumps
Post-Bid
Conway, SC 29528

Replace Existing 35 Year-Old Potable Well at Waddell Mariculture Center
Results
Bowman, SC

Installation of Residential Wells (18 Sites)
Post-Bid
Adams Run, Edisto Island, McClellanville, Ravenel, Wadmalaw Island, SC 29449

Well Drilling Services for the Construction of a Well at Samworth WMA
Results
Less than $29,014 est. value
Georgetown, SC 29440

Midtown Sewer Improvements
Post-Bid
Shell Point, SC

Buck Hall Well Construction
Results
Less than $25,000 est. value
McClellanville, SC 29458

Repair Irrigation Wells
Post-Bid
Chapin, SC 29036

CWS Hanahan Water Treatment Plant Pump and Motor
Results
Less than $217,761 est. value
Charleston, SC 29402

Last Updated 05/05/2021 05:26 PM
Project Title

Irrigation Well Testing and Repair

Physical Address View project details and contacts
City, State (County) Lexington, SC   (Lexington County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Test and make all necessary repairs to non-operational irrigation wells at Chapin Middle School (CMS), Spring Hill High School (SHHS), The Center for Advanced Technical Studies (CATS), and Oak Pointe Elementary School (OPES) to ensure proper function and operation. The number of wells and the number of known non-operational wells at each campus is listed below. 1. CMS-3 wells, 1 non-operational. 2. SHHS-5 wells, 3 non-operational. 3. CATS-2 wells, All non-operational. 4. OPES-2 wells, All non-operational.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents