Similar Projects
Forest Hills Pipe Lining
Infrastructure
Bidding
North Charleston, SC

Palmetto Ridge and Hickory Street - Shell Point Drainage and Easement Clearing
Infrastructure
Bidding
Beaufort, SC 29906

Purchase of Reinforced Concrete Pipe (RCP)
Post-Bid
North Charleston, SC 29405

Ashley Villas Drainage Improvements Phase 3
Post-Bid
North Charleston, SC 29405

Drainage Improvements Project at Bryson Elementary School
Results
Simpsonville, SC 29681

Detention Pond Maintenance and Repair
Results
Columbia, SC

Cherokee Pipe Repair
Term Contract, Infrastructure
Bidding
Blacksburg, SC 29702

Drainage Improvements North Side
Post-Bid
Aynor, SC 29511

Knollwood and Planters Drainage Improvement
Results
Columbia, SC

Old Mill Culvert Replacement and Maintenance Repairs
Infrastructure
Bidding
$200,000 to $300,000 est. value
Charleston, SC 29414

Renovations to Sandy Beach WMA
Renovation
Post-Bid
Pineville, SC 29468

Dunoon Drive Drainage Improvement Project
Results
Less than $64,640 est. value
Charleston, SC 29401

Pipe Repair-Charleston County
Infrastructure
Bidding
SC

Southwood Academy of the Arts Drainage System for Performing Arts Center
Post-Bid
Anderson, SC 29624

Drainage Ditch Stabilization
Results
$350,000 est. value
Lexington, SC 29071

Reported 08/11/2021 12:00 AM
Project Title

Morris - Bryan Energy Center Drainage Improvements

Physical Address View project details and contacts
City, State (County) Columbia, SC 29203   (Richland County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $100,000 to $120,000
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Base bid consisting of the replacement of approximately 264 LF of 15-inch RCP, 49 LF of 18-inch RCP, 24-inch RCP, and miscellaneuous appurtenances; installation of 154 LF of 12-inch HDPE pipe, 150 LF of 4-inch CPP or PVC underdrain, 3 junction boxes, 2 catch basins, associated rip rap and grading. Alternate 1 consisting of sliplining 33 LF of existing 12-inch RCP with 10-inch fusible PVC. Alternate 2 consisting of removal and replacement of 33LF of existing 12-inch RCP with HDPE pipe.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents