Similar Projects
Reported | 08/11/2021 12:00 AM |
Project Title | Morris - Bryan Energy Center Drainage Improvements |
Physical Address | View project details and contacts |
City, State (County) | Columbia, SC 29203 (Richland County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | $100,000 to $120,000 |
Plans Available from | Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Base bid consisting of the replacement of approximately 264 LF of 15-inch RCP, 49 LF of 18-inch RCP, 24-inch RCP, and miscellaneuous appurtenances; installation of 154 LF of 12-inch HDPE pipe, 150 LF of 4-inch CPP or PVC underdrain, 3 junction boxes, 2 catch basins, associated rip rap and grading. Alternate 1 consisting of sliplining 33 LF of existing 12-inch RCP with 10-inch fusible PVC. Alternate 2 consisting of removal and replacement of 33LF of existing 12-inch RCP with HDPE pipe. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |